Similar Projects
Grade, Drain and Bridge - US 59
Infrastructure
Design
$21,063,165 CJ est. value
Poteau, OK 74953

Grade, Drain and Bridge - US 59
Infrastructure
Design
$21,063,165 CJ est. value
Poteau, OK 74953

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Grade, Drain and Surface - US 59
Infrastructure
Design
$38,725,816 CJ est. value
Poteau, OK 74953

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Dollar General / Shady Point
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,800,000 CJ est. value
Shady Point, OK 74956

One Lot of Chainlink and Poles
Infrastructure
Post-Bid
$15,000 CJ est. value
Spiro, OK 74959

Old Spiro Lake Nature Trail
Infrastructure
Post-Bid
$400,000 CJ est. value
Spiro, OK 74959

Resurface (Asphalt) Us-270: From 1.0 Mile West of the Leflore County Line, Extend East Near Fanshawe
Infrastructure
Post-Bid
$1,451,205 CJ est. value
Fanshawe, OK 74966

Resurface (Asphalt) - US-270/US-271
Infrastructure
Post-Bid
$1,030,098 CJ est. value
Wister, OK 74966

Sidewalks / Concrete Work
Infrastructure
Post-Bid
$200,000 CJ est. value
Heavener, OK 74937

Last Updated 04/05/2023 12:11 PM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Wister, OK 74966   (Le Flore County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $820,256 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description of work: Exploratory Digging - 6", 4" & 2" PVC Waterline - Gravel, Asphalt, Concrete Cut & Repair - Seed & Mulch - Bore Pit - WaterMeter w/MeterBox - Traffic Control - 12" Road Bore Encased in Steel Pipe - 6" Road Bore Non-Encased - 6" & 4" Fire Hydrant Assembly - 6", 4" & 2" Gate Valves - Testing - MJ Fittings w / MegaLugs. The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the condition s provided in the Information for Bidders. No bidder may withdraw his bid within 30 days after the actual date of the opening thereof. This project is also to be financed with a Community Development Block Grant; therefore, the bids and construction shall comply with the following. 18603 CDBG 22 All bids must include with assurances that the following provisions will be complied with: 1 . Federal Labor Standards Provisions, US Department of Labor, 29 CFR 5; 2. Section 3 Final Rule became effective on November 30, 2020 and is codified at 24 CFR part 75. The regulation simplifies the Section 3 requirements and establishes that Section 3 requirements apply to housing rehabilitation, housing construction, and other public construction projects assisted under HUD programs that provide housing and community development financial assistance when the total amount of HUD assistance to the project exceeds a minimum funding threshold. The regulation also improves alignment with current business practices by requiring the reporting of labor hours rather than new hires. The Benchmark Notice establishes the current numeric goals for compliance with Section 3 requirements. 3. Section 109 of the Housing and Community Development Act of 1974, which assures that no person shall, on the grounds of race, color, natural origin or sex, be excluded from participation in, be denied the benefits of or be subjected to discrimination; 4. Certification of Non-Segregated Facilities, which assures the bidder does not maintain or provide any segregated facilities; comply with the terms of Section 504 and the American with Disabilities Act. 5. Equal Opportunity Provision - Executive Order 11246 , as amended, which assures non-discrimination; 6. Minority Business Enterprise and Women Business Enterprise provision which encourage minority owned business and owned business and women-owned businesses to bid on the project; 7. Assurances that surety companies executing bonds appear on the Treasury Department's list and are authorized to transact business in the State where the project is located. 8. System for Award Management (SAM) Registration and a Unique Entity ID number is required for CDBG Bidders (Prime contractors) in order to be awarded projects by the CDBG program. Bidders must go to website. to complete the registration process. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. No bidder may withdraw his bid within 30 days after the actual date of the opening thereof.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents