Similar Projects
Construction - Replace Roof
Alteration
Design
$5,000,000 to $7,000,000 est. value
Cincinnati, OH 45220

Golden View Acres Roof Replacement
Alteration
Post-Bid
$130,000 est. value
Sharonville, OH 45241

Gymnasium Roof Replacement, Parapet Walls, Glass Block Window Replacement and Gymnasium Entrance
Alteration
Post-Bid
Dillonvale, OH

Roof Repair
Alteration
Results
Silverton, OH 45236

Anderson HS Partial Roof Replacements Anderson HS Partial Parking Lot Resurfacing
Infrastructure, Alteration
Results
Cincinnati, OH 45255

Public Works Salt Dome Reroof Project
Alteration
Post-Bid
$105,000 est. value
Cincinnati, OH 45246

Animal Shelter 2022 Roof Replacements
Alteration
Results
$350,000 est. value
OH

Main Gym Roof Replacement
Alteration
Post-Bid
Cincinnati, OH 45223

2021 Public Works Facility Roof Retrofit Project
Alteration
Results
Indian Hill, Milford, OH 45150

Roof Replacement Services
Term Contract
Post-Bid
$6,000 to $1,500,000 est. value
Cincinnati, OH

Salt Dome Roof Replacement
Alteration
Results
OH 45238

Roof Replacement: Queensgate Radio Control Center and Training Trailer
Renovation
Post-Bid
$400,000 CJ est. value
Cincinnati, OH 45214

Nagel Middle School - Roof Replacement
Alteration
Results
$319,900 est. value
Cincinnati, OH 45255

Braunstein Hall Roof Restoration
Renovation
Post-Bid
$250,000 CJ est. value
Cincinnati, OH 45219

Partial Roof replacement at Mariemont Elementary School
Alteration
Results
Cincinnati, OH 45227

Last Updated 02/15/2023 03:09 PM
Project Title

University of Cincinnati - University Hall Roof Replacement

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45220   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,453,015 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Cincinnati seeks Design Services to replace existing roofs of (2) buildings. University Hall is a six-story administrative office building, and this portion of the project will replace the 32,000+/-SF EPDM roof with a 2-ply modified bitumen system with a granulated cap sheet and remove/replace pavers at terraces. University Pavilion is a six-story administrative office building, and this portion of the project will replace the 14,000+/-SF EPDM roof with a 2-ply modified bitumen system with a granulated cap sheet. The estimated construction cost for University Hall is $1,800,000 and the estimated construction cost for University Pavilion is $850,000 for an estimated total construction cost of $2,650,000. Total Project Cost: $3,453,015 The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements and Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. Also, the selected A/E will work with the University to determine the best approach to bidding. The EDGE Participation Goal for the Project is 10.0 percent

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents