Similar Projects
2023 Alexander Street Project
Infrastructure
Bidding
$600,000 CJ est. value
Alexander, ND 58831

DSU Request for Concrete repairs
Renovation
Sub-Bidding
$128,000 CJ est. value
Dickinson, ND 58601

Gymnasium Floor Covering
Alteration
Post-Bid
Oberon, ND

Class 13 Aggregate and Crushed Concrete
Term Contract
Post-Bid
ND

Bismarck Public Schools Concrete
Alteration
Results
Bismarck, ND 58501

2022 Flood Protection Property Markers
Infrastructure
Results
$25,600 est. value
Grand Forks, ND

ECRWD - Facility Expansion
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Thompson, ND 58278

Airfield Pavement Slurry Seal
Infrastructure
Results
$231,443 CJ est. value
Edgeley, ND 58433

Concrete Pavement Repair
Infrastructure
Post-Bid
$800,000 CJ est. value
Wahpeton, ND 58075

Street Improvement District 224
Infrastructure
Results
$2,480,000 est. value
Mandan, ND

Chip Seal
Infrastructure
Post-Bid
$800,000 CJ est. value
Beach, ND 58621

South Washington Street Concrete Bikepath
Infrastructure
Results
$199,285 est. value
Grand Forks, ND 58201

Greenhouse Concrete Replacement
Infrastructure
Post-Bid
$800,000 CJ est. value
Fargo, ND 58102

Water, Sewer, Storm and Street Improvement District No. 2022-11 Cub Creek 2nd Addition
Infrastructure
Results
$16,111,086 CJ est. value
Horace, ND 58047

Deck Overlay, End Post Modification, Rail Retrofit, Approach Slabs, Guardrail, Approach Pavement
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Menoken, ND 58558

Last Updated 06/15/2023 09:44 AM
Project Title

Paving and Rehab/reconstruction

Physical Address View project details and contacts
City, State (County) Fargo, ND 58102   (Cass County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,947,620 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 6, 2023, construction is underway and expected to be completed by September 30, 2023. Paving and Utility Rehab/Reconstruction On Northern Pacific Avenue North from 10th Street to 8th Street. COMPRISING: South 51-1/3 feet of Block 24. All in Robert's 2nd Addition. Lots A thru M, a Subdivision of Lots 1, 2, 3, 14, 15, 16, & 17 of Block 7 and the adjacent vacated alley. The south 17 feet of the east 81 feet of Lot 13 and the adjacent vacated alley. All in Robert's Addition. Lots 1 through 6, inclusive All in Hagaman's (Subdivision of West 1/2 of Block 6 Roberts Addition). Scope- replacement of the water main and services, sanitary sewer main and services, storm sewer main and inlet leads, concrete curb & gutter, sidewalk, driveways, and street scape. . All work included in the contract must be fully completed on or before September 30, 2023. Purpose The existing water main is cast iron pipe (CIP), which was installed over 100 years ago and is being replaced with polyvinyl chloride (PVC) to minimize impacts and costs associated with breaks. The estimated cost of construction is $2,386,307.00. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents