Similar Projects
Klus Design Facility
New Construction, Infrastructure
Conception
$9,500,000 CJ est. value
Vero Beach, FL 32968

Klus Design Facility
New Construction, Infrastructure
Conception
$9,500,000 CJ est. value
Vero Beach, FL 32968

98th Avenue Manufacturing Addition
Addition, Demolition, Infrastructure - 11,496 SF
Design
$6,200,000 CJ est. value
Vero Beach, FL 32966

98th Avenue Manufacturing Addition
Addition, Demolition, Infrastructure - 11,496 SF
Design
$6,200,000 CJ est. value
Vero Beach, FL 32966

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Add Lanes and Reconstruct/Drainage Improvements/Milling and Resurfacing/Bridge Replacement
Infrastructure
Bidding
$103,520,022 CJ est. value
Vero Beach, FL 32968

New York Avenue Sidewalk
Infrastructure
Post-Bid
$485,700 est. value
Fellsmere, FL

SRA1A (US105) from Shad Creek to Little Talbot Island - BDI
Infrastructure
Post-Bid
$1,010,525 est. value
Vero Beach, FL 32969

North Central Region Waterway Marker Project
Infrastructure
Results

6th Avenue Milling and Resurfacing from U.S. 1/S.R. 5 to 21st Street
Infrastructure
Results
$1,800,000 est. value
Vero Beach, FL 32969

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Indian River Boulevard Mixed Use Development
New Construction, Infrastructure - 65,685 SF
Pending Verification
$24,700,000 CJ est. value
Vero Beach, FL 32967

Indian River Boulevard Mixed Use Development
New Construction, Infrastructure - 65,685 SF
Pending Verification
$24,700,000 CJ est. value
Vero Beach, FL 32967

98th Avenue Manufacturing Addition
Addition, Demolition, Infrastructure - 11,496 SF
Conception
$6,200,000 CJ est. value
Vero Beach, FL 32966

Publix - Bridge Marketplace / Sebastian
New Construction, Infrastructure - 34,084 SF
Design
$12,200,000 CJ est. value
Sebastian, FL 32958

Last Updated 03/10/2023 01:03 PM
Project Title

Replacement Pontoon Boat Dock at the Environmental Learning Center

Physical Address View project details and contacts
City, State (County) Vero Beach, FL 32963   (Indian River County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $331,456 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: The PROJECT entails (a) removal of the existing Pontoon Boat Dock, and (b) new dock construction with water and electric service, an entrance gate, and adjacent sidewalk . Project Address: 255 Live Oak Drive Vero Beach, FL 32963 All bids received after 2:00 P.M., on the day specified above, will not be accepted or considered . All bidders shall submit one (1) original and one (1) copy of the Bid Proposal forms provided within the specifications. Please note that the questionnaire must be filled out completely including the financial statement. BID SECURITY must accompany each Bid, and must be in the form of an AIA Document A310 Bid Bond, properly executed by the Bidder and by a qualified surety, or a certified check or a cashier's check, drawn on any bank authorized to do business in the State of Florida. Bid Security must be in the sum of not less than Five Percent (5%) of the total amount of the bid, made payable to Indian River County Board of County Commissioners. In the event the Contract is awarded to the Bidder, Bidder will enter in a Contract with the County and furnish the required 100% Public Construction Bond and certificates of insurance within the timeframe set by the County. If Bidder fails to do so, the Bid Security shall be retained by the County as liquidated damages and not as penalty . The OWNER reserves the right to reject bids from Bidders that are unable to meet the listed required qualifications. OWNER reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. OWNER further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be nonresponsible. OWNER may also reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder. OWNER also reserves the right to waive all technicalities and informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder. The OWNER will not reimburse any Bidder for bid preparation costs. OWNER reserves the right to cancel the award of any Contract at any time before the execution of such Contract by all parties without any liability to the OWNER. For and in consideration of the OWNER considering Bids submitted, the Bidder, by submitting its Bid, expressly waives any claim to damages, of any kind whatsoever, in the event the OWNER exercises its right to cancel the award in accordance herewith. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified, which shall be stated in the Agreement. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. Liquidated damages will commence for this portion of work. The parties also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER _$338.00 for each calendar day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER _$338.00 for each calendar day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment Job no- P-ELC Questions regarding the work should be directed to Cody Smith, AIA, of Seay, Seay & Litchfield, csmith@sslarch.com, unless noted otherwise.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents