Similar Projects
Design Services for George Wythe High School Replacement
New Construction, Term Contract, Infrastructure - 300,000 SF
Bidding
Richmond, VA 23225

CCS Vestibule Security Addition
Addition
Bidding
Charlottesville, VA 22901

Renovation of School Based Health Care Clinic
Renovation - 1,185 SF
Post-Bid
Petersburg, VA

Renovation of CTE Lab and New Switch Gear
Renovation
Post-Bid
Dublin, VA 24084

PPEA for Design-Build of New High School
New Construction
Results
South Boston, VA 24592

Stonewall Jackson High School Concessions and Toilets
Results
Manassas, VA

Robert E. Aylor Middle School Replacement Project
New Construction - 147,355 SF
Construction
$48,700,000 est. value
Stephens City, VA 22655

Woodbine Renovation
Renovation
Construction
$1,311,324 est. value
VA

Redevelopment Commissioning Services for New High School
New Construction - 320,425 SF
Post-Bid
$150,000,000 est. value
Alexandria, VA 22302

Centreville High School Room Modification 2
Renovation
Results
Clifton, VA 20124

Auxiliary Gym Addition - Woodbridge High School
Addition - 20,000 SF
Construction
$5,444,000 est. value
Woodbridge, VA 22192

Cedar Lee Middle School Expansion and Renovation Project
Renovation, Addition - 105,062 SF
Post-Bid
Bealeton, VA 22712

Justice High School Science Lab
Results
Falls Church, VA 22044

Auxiliary Gym Addition - Garfield High School
New Construction, Addition - 20,000 SF
Construction
Woodbridge, VA 22192

Portable Classroom Services
Results
Virginia Beach, VA 23456

Reported 07/13/2021 08:39 AM
Project Title

Gainesville Middle School Additions

Physical Address View project details and contacts
City, State (County) Gainesville, VA 20155   (Prince William County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced third quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work generally consists of the construction of two additions, slab on grade, steel bearing structure with cold form framing and brick veneer to match existing building. Two cover emergency egresses from existing building to the existing access road must always be maintained during the project. Interior finishes including electrical, HVAC, and sprinkler shall be provided by Contractor unless noted otherwise. Responsibility for maintenance of all existing erosion control devices, if provided under a separate contract, is included.

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents