Similar Projects
Brentwood Boulevard Widening North - Phase 1 - 336-31620
Infrastructure
Conception
$7,050,340 est. value
Brentwood, CA 94513

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose Preschool
New Construction - 20,986 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Walnut Creek, CA 94598

Pittsburg High School New Softball Field
Infrastructure
Bidding
$3,000,000 CJ est. value
Pittsburg, CA 94565

Pittsburg High School New Softball Field
Infrastructure
Bidding
$3,000,000 CJ est. value
Pittsburg, CA 94565

532 Mt Diablo Blvd
New Construction, Infrastructure
Sub-Bidding
$13,600,000 CJ est. value
Walnut Creek, CA 94596

532 Mt Diablo Blvd
New Construction, Infrastructure
Sub-Bidding
$13,600,000 CJ est. value
Walnut Creek, CA 94596

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Parking Lot Repairs and Seal and Stripe Services at the Concord Department of Motor Vehicles Field Office
Term Contract
Results
Concord, CA 94520

Traditions at the Meadow Subdivision
New Construction - 7,500 SF
Pending Verification
$1,000,000 est. value
Martinez, CA 94553

Walden Garden Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Walnut Creek, CA 94597

Walnut Park Playground Replacement - City of Brentwood
New Construction
Conception
$357,440 est. value
Brentwood, CA 94513

Last Updated 08/10/2022 11:35 AM
Project Title

Sand Creek Sports Complex - City of Brentwood

Physical Address View project details and contacts
City, State (County) Brentwood, CA 94513   (Contra Costa County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $12,832,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is included in the City's Strategic Plan for FY 2022/23 - FY 2023/24. Sand Creek Sports Complex Phase I consists of the design and construction of the 14.50 acres of City owned property identified as the future Sand Creek Sports Complex. It is anticipated that the park will include up to 2-3 full size sports fields (soccer/ multi-use to be determined), parking lot, restrooms, picnic area and other possible park amenities like pickle ball courts, basketball courts, exercise equipment, playground etc. Phase II is made up of the Contra Costa County Flood Control detention basin, which consists of 19.24 acres, will potentially add 2-3 sports fields. The total project estimated cost is $15 million. The project is included in the City of Brentwood's FY 2022/23 - 2026/27 Capital Improvement Program (CIP). Per the owner, staff is currently working on the RFP for this project. The owner states that they anticipate the RFP for planning, design construction to be put out for bid in August of 2022. As of August 10, 2022, an RFP has not yet been issued for this project. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents