Similar Projects
Well Assessments
Post-Bid
Owyhee, NV

Well Drilling
Post-Bid
NV

Y--Design-Build: Lahontan NFH Well Replacement
Results
$1,000,000 to $5,000,000 est. value
Gardnerville, NV

Deep And Shallow Sonic Monitoring Wells - Truckee Meadows Water Authority
Results
Reno, NV 89502

Lear Lift Station Improvement
Renovation
Post-Bid
$3,200,000 to $3,700,000 est. value
Reno, NV 89506

Pump Station Surge Improvements
Renovation
Results
$1,275,628 est. value
Henderson, NV

Drill and Develop Bastian Ranch Irrigation Well No SPR7043I
Infrastructure
Post-Bid
$917,200 est. value
Las Vegas, NV

Kinglet Booster Pump Station
New Construction
Results
$837,000 to $1,023,000 est. value
Reno, NV

Well J8 Equipping
Results
$757,000 est. value
Las Vegas, NV

Well Number 36
Results
$2,830,260 est. value
Mesquite, NV 89024

Pump Station 12 Upgrades
Renovation
Results
$1,234,913 est. value
Henderson, NV

Centennial 2635 Zone Reservoir and 2745 Zone Pumping Station
New Construction
Results
$30,383,200 est. value
Las Vegas, NV

6" Diameter Mud-Rotary Monitoring Wells
Results
$454,500 to $555,500 est. value
Reno, NV

4125 Zone Pumping Station
Results
$12,880,119 est. value
Las Vegas, NV

Confined Space Pump and Motor Repair Services
Infrastructure
Results
Las Vegas, NV

Last Updated 01/14/2022 01:40 PM
Project Title

STMGID Arrowcreek BPS

Physical Address View project details and contacts
City, State (County) Reno, NV 89511   (Washoe County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,935,000 to $2,365,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All labor, materials, equipment, and incidentals required for the construction of a booster pumping facility. Including: CMU building, standby generator, vertical turbine pumps, pump control valves, pressure reducing facility a piping, bypass regulator improvements, general facility piping and underground improvements necessary to connect the facility to TMWA's distribution system.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents