Similar Projects
Center Street Corridor Streetscaping
Infrastructure
Bidding
$300,000 est. value
Cedar Falls, Cedar Rapids, IA 52401

Strayer-Wood Theater Loop Drive and Pavement Repairs and Maintenance on Panther Parkway
Infrastructure
Bidding
$395,000 est. value
Cedar Falls, IA 50614

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Results
Waterloo, IA

FY2021 Sidewalk and Trail Repair Program Zone 1
Infrastructure
Results
Waterloo, IA 50703

Facilities Management North Parking Lot - Phase 2
Infrastructure
Results
Cedar Falls, IA

2021 Public Sidewalk Repair and Infill
Infrastructure
Results
$190,958 est. value
Cedar Falls, IA

2021 CDBG Sidewalk Infill
Infrastructure
Results
$176,242 est. value
Cedar Falls, IA

2021 Permeable Alley
Infrastructure
Results
$107,175 est. value
Cedar Falls, IA

2021 Sidewalk Assessment
Infrastructure
Results
$62,813 est. value
Cedar Falls, IA

Black Hawk Co George Wyth Trail Repair
Infrastructure
Results
IA

PCC Sidewalk/Trail
Infrastructure
Results
IA

Earth or Granular Surface Trail
Infrastructure
Results
IA

2022 Street Construction
Infrastructure
Results
$3,180,054 est. value
Cedar Falls, IA

PCC Sidewalk/Trail
Infrastructure
Results
IA

College Hill Parking Lot Improvements Project
Infrastructure
Results
Cedar Falls, IA

Reported 06/03/2022 12:00 AM
Project Title

FY 2022 Sidewalk Repair Program - Zone 2

Physical Address View project details and contacts
City, State (County) Waterloo, IA   (Black Hawk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removing and replacing PCC sidewalk of various widths and thicknesses and placement of ADA truncated domed ramps where required within Zone 2 of the City of Waterloo's Sidewalk Repair Program. This project is generally located in an area bounded by: Highway 63 - University Avenue - Washington Street - West 6th Street - Williston Avenue - Campbell Avenue - Moir Street. This project will also include sidewalk infill between two existing sections of sidewalk. The following are general locations for each sidewalk infill: Logan Avenue and Kern Street The work under the proposed contract shall be commenced within ten (10) working days after receipt of "Notice to Proceed" and all items shall be completed on or before October 21, 2022.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents