Similar Projects
Western DuPage Special Recreation Association Paint and Flooring
Renovation
Sub-Bidding
$12,000 CJ est. value
Carol Stream, IL 60188

2021 Painting Services
Alteration
Post-Bid
Downers Grove, IL

Fuel Farm Painting Upgrades
Alteration
Post-Bid
West Chicago, IL 60185

2021 Exterior Wall Repairs and Recoating
Results
Addison, IL 60101

Ground Storage Reservoirs Cleaning, Repair & Painting
Infrastructure, Alteration
Results
West Chicago, IL 60185

Lake Street and Ornamental Streetlight Pole Painting
Alteration
Post-Bid
Addison, IL

Water Tower Painting and Miscellaneous Repair
Infrastructure, Alteration
Results
Woodridge, IL 60517

Cleaning, Repairing and Painting
Alteration
Post-Bid
West Chicago, IL

Cosley Zoo Siding and Exterior Painting
Infrastructure, Alteration
Results
Wheaton, IL 60187

Transmission Pole Painting
Alteration
Post-Bid
Naperville, IL

Mill Street Pressure Adjusting Station 15E-Clean, Repair and Paint Water Pipe
Alteration
Results
$400,000 est. value
Naperville, IL 60563

Fire Hydrant Painting
Alteration
Post-Bid
Saint Charles, IL

Systemwide Pavement Marking Installation
Infrastructure
Results
$3,883,491 CJ est. value
Downers Grove, IL 60515

Butler Jr High Gym Roof and Painting
Alteration
Post-Bid
Oak Brook, IL 60523

Painting
Alteration
Post-Bid
Elmhurst, IL

Last Updated 11/30/2022 10:42 AM
Project Title

Influent, Effluent, And 72 Inch Meter Buildings Coatings Rehabilitation

Physical Address View project details and contacts
City, State (County) Elmhurst, IL 60126   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $440,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Invitation to Bid Owner invites sealed Bidders Proposals for the Work described in the Contract and generally described as follows: Recoating 48-inch and 84-inch diameter steel water main, surge relief piping, ductile iron footing drains, and sump pump piping within certain buildings at the DuPage Pump Station. The contractor shall remove and properly dispose of existing insulation on pipeline, perform abrasive blasting, and apply a thermal break system to all steel water piping. All bidders must provide documentation of valid experience.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents