Similar Projects
Renovation of Soccer Fields at Riverway Sports Park
Infrastructure
Design
$180,000 CJ est. value
Visalia, CA 93291

RFQ Contractor - Prequalification of Concrete - Peninsula Outpatient Center
Infrastructure, Renovation - 50,000 SF
Design
$250,000 CJ est. value
San Francisco, CA 94103

Master As-Needed Agreement M14 Curb Ramp Construction
Term Contract
Sub-Bidding
$1,000,000 CJ est. value
San Francisco, CA 94103

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Joslyn Senior Center Renovation
Renovation, Infrastructure
Results
$1,033,800 CJ est. value
Redlands, CA 92373

Concrete Pad and Hydronic Tubing Replacement Services
Infrastructure
Results
$137,214 est. value
Truckee, CA 96161

Second Street Drainage and Parking Lot Improvements, Phase II
Infrastructure
Construction
$912,593 CJ est. value
Solvang, CA 93463

Annual Residential Street Rehabilitation Project (Phase 2B)
Term Contract
Post-Bid
Compton, CA 90221

Place Minor Concrete, Replace Irrigation and Electrical Facilities
Alteration
Results
$5,400,000 est. value
CA

On Call Concrete Services
Term Contract
Post-Bid
Napa, CA

Concrete Repairs and Maintenance
Alteration
Results
$655,000 est. value
Ontario, CA 91764

Rehab Bid Package for 1 Parrot St Vallejo Ca
Alteration
Post-Bid
Vallejo, CA

Citywide Concrete Repair FY 2021/2022
Infrastructure
Results
$859,538 CJ est. value
Rancho Cucamonga, CA 91730

SDIA - Airport Administration Building - Site Concrete
Alteration
Post-Bid
San Diego, CA 92101

Last Updated 08/23/2023 06:01 PM
Project Title

LMC Campus Re-Key Project

Physical Address View project details and contacts
City, State (County) Pittsburg, CA 94565   (Contra Costa County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $389,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Cost Estimate (Range): $750,000 - $850,000. Governing Board of the Contra Costa Community College District (District),Martinez, California, will receive sealed bid proposals for the furnishing of all labor, materials, equipment, transportation and services for the construction of the project entitled L-1209 LMC Campus Re-Key Project. In general, the Work consists of the following, but not limited to: Updating the door and gate locking hardware on the entire campus to accept Corbin Russwin Large Format Interchangeable Cores while meeting ADA and Fire Code requirements. It also includes the procurement of factory keyed Medeco/Keymark X4 Corbin Russwin Large Format Interchangeable Cores and Intelligent Key Cabinet. The District does not provide hardcopies of bid documents or reimburse the cost of printing, delivery, or any expenses related to the bidding process. Each bid shall be made on the BID PROPOSAL FORM (SECTION 00300), which is included in the Bid Documents and when submitted, shall be accompanied by a Bid Bond or Certified Cashier's Check in the amount of 10% of bid (made payable to the Contra Costa Community College District). The District reserves the right to forfeit Bid Bond submitted for failure of the successful bidder to secure Payment and Performance Bonds. Bids must be received by the District prior to the time and by the date noted above. Bids that are not received by the District prior to the time and by the date noted above will not be accepted, and will be returned to the Bidder, unopened. The District is not responsible for lost or misplaced proposals delivered by a 3rd party carrier. The successful bidder will be required to furnish a labor and material bond in an amount equal to one hundred percent (100%) of the contract price and a faithful performance bond in an amount equal to one hundred percent (100%) of the contract price, said bonds to be secured from a surety company acceptable to the Contra Costa Community College District and authorized to execute such surety in the State of California. Certificates of Liability Insurance with proper endorsements shall be required for the successful bidder. Attention is directed to Section 4100 through 4113 of the Public Contract Code concerning Subcontractors, with emphasis on Section 4104, known as the "Subletting and Subcontracting Fair Practices Act, effective July 1, 2014". Attention is directed to Labor Code Section 1725.5 regarding Department of Industrial Relations (DIR) contractor registration process including registration criteria and implementation of DIR registration requirements. Labor Code Section 1771.7 establishes contractor's obligation to submit Certified Pay Roll (CPR) to the Department of Labor and Standards Enforcement (DLSE) and public works monitoring and enforcement. Labor Code Section 1773.3 requires the District to submit a PWC-100 to DIR for all public works contract awarded effective January 1, 2015. Failure to submit all of the above may cause your bid to be non-responsive and disqualified for contract award. The contract time is 151 Calendar Days between the Notice to Proceed date and the Contract Substantial Completion date. Attention is directed to Section 00600, Construction Agreement, Article 5, regarding liquidated damages. Liquidated Damages shall be set for One Thousand Dollars ($1,000) for each Calendar Day the Work is delayed beyond the contract Substantial Completion date; and Five Hundred Dollars ($500) for each Calendar Day Remaining Work is delayed beyond the Contract Final Completion Date. The Governing Board of the Contra Costa Community College District reserves the right to reject any and all bids and/or waive any informality or irregularity in any bid received. No bidder may withdraw their Bid for a period of ninety (90) days after the date set for opening thereof. The successful Bidder shall furnish a Labor and Material Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price and a faithful Performance Bond in the amount equal to 100 percent (100%) of the Contract Price as security for the successful performance of the work and payment of persons performing labor and furnishing materials. The Bonds shall be executed by a surety company or companies acceptable to the District and authorized to execute such in the State in which the Project is located and shall be furnished within 10 days after Notice of Acceptance of said Bid. Surety shall be made in favor of the District and shall cover the guarantee periods as well as the construction period. This Bid may be withdrawn or revised prior to the scheduled time for receipt. Bids not withdrawn prior to the scheduled time for receipt may not be withdrawn for a period of 90 days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/08/2023 at 2:00 PM PT All questions related to this project must be submitted electronically, Amy Sterry, Director of Purchasing and Contract Services Contra Costa Community College District Email: asterry@4cd.edu .

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents