Reported 04/28/2021 12:00 AM
Project Title

Polethylene Pipes and Fittings

Physical Address View project details and contacts
City, State (County) FL   (Orange County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Item # Description Estimated Quantity Unit Unit Price Total Estimated Bid Corrugated Smooth Inter HDPE pipe N-12 or equal bell and spigot 1 12" Pipe 1,000 LF x $____________/lf = $_______________ 2 15" Pipe 2,000 LF x $____________/lf = $_______________ 3 18"Pipe 2,000 LF x $____________/lf = $_______________ 4 24"Pipe 1,000 LF x $____________/lf = $_______________ 5 30" Pipe 1,000 LF x $____________/lf = $_______________ 6 36" Pipe 500 LF x $____________/lf = $_______________ 7 42" Pipe 500 LF x $____________/lf = $_______________ Smooth interior and smooth exterior HDPE pipe N-12HC or equal bell & spigot $_______________ 8 48" Pipe 600 LF x $____________/lf = $_______________ 9 60" Pipe 500 LF x $____________/lf = $_______________ Custom PVC Drainage structures, Nyloplast Drain Basin or equal. Basin designed with standard elevation heights $_______________ 10 12" Drain basis (standard elevation 24") (4ea stub outs included) 5 EA x $___________/ea = $_______________ 11 Additional vertical cost per foot 20 LF x $____________/lf = $_______________ 12 15" Drain basis (standard elevation 30") (4ea stub outs included) 5 LF x $____________/lf = $_______________ 13 Additional vertical cost per foot 20 LF x $____________/lf = $_______________ 14 18" Drain basis (standard elevation 36") (4ea stub outs included) 5 EA x $___________/ea = $_______________ 15 Additional vertical cost per foot 20 LF x $____________/lf = $_______________ 16 24" Drain basis (standard elevation 36") (4ea stub outs included) 2 EA x $___________/ea = $_______________Page 39 17 Additional vertical cost per foot 10 LF x $____________/lf = $_______________ 18 30" Drain basis (standard elevation 46") (1ea stub out included) 2 EA x $___________/ea = $_______________ 19 Additional cost per foot 10 LF x $____________/lf = $_______________ PVC in line drainage structures, Nyloplast in line drains or equal $_______________ 20 8" inline structure 5 EA x $___________/ea = $_______________ 21 10" inline structure 5 EA x $___________/ea = $_______________ 22 12" inline structure 5 EA x $___________/ea = $_______________ 23 15" inline structure 5 EA x $___________/ea = $_______________ 24 18" inline structure 5 EA x $___________/ea = $_______________ 25 24" inline structure 2 EA x $___________/ea = $_______________ 26 30" inline structure 2 EA x $___________/ea = $_______________ N-12 Fabricated 45 degree and 90-degree bends- 12"-24" Diameter $_______________ 27 12" 45 bend 5 EA x $___________/ea = $_______________ 28 15" 45 bend 5 EA x $___________/ea = $_______________ 29 18" 45 bend 5 EA x $___________/ea = $_______________ 30 24" 45 bend 5 EA x $___________/ea = $_______________ HDPE Pipe Couplings (Split) $_______________ 31 12" 20 EA x $___________/ea = $_______________ 32 15" 20 EA x $___________/ea = $_______________ 33 18" 20 EA x $___________/ea = $_______________ 34 24" 20 EA x $___________/ea = $_______________ 35 30" 10 EA x $___________/ea = $_______________ 36 36" 10 EA x $___________/ea = $_______________ Slotted corrugated HDPE pipe and couplings $_______________ 37 6" slotted pipe with sock 1000 LF x $____________/lf = $_______________ 38 8" slotted pipe with sock 1000 LF x $____________/lf = $_______________ 39 6" coupling 100 EA x $___________/ea = $_______________ 40 8" coupling 100 EA x $___________/ea = $_______________Page 40 41 6" 45-degree bend 5 EA x $___________/ea = $_______________ 42 8" 45-degree bend 5 EA x $___________/ea = $_______________ Flexible Pipe $_______________ 43 6" Corrugated 50 LF x $____________/lf = $_______________ 44 8" Corrugated 50 LF x $____________/lf = $_______________ 45 6" smooth 50 LF x $____________/lf = $_______________ 46 8" smooth 50 LF x $____________/lf = $_______________ Total Estimated Bid Amount Base Year $______________________ Item # Description Estimated Quantity Unit Unit Price Total Estimated Bid Corrugated Smooth Inter HDPE pipe N-12 or equal bell and spigot 47 12" Pipe 1,000 LF x $____________/lf = $_______________ 48 15" Pipe 2,000 LF x $____________/lf = $_______________ 49 18"Pipe 2,000 LF x $____________/lf = $_______________ 50 24"Pipe 1,000 LF x $____________/lf = $_______________ 51 30" Pipe 1,000 LF x $____________/lf = $_______________ 52 36" Pipe 500 LF x $____________/lf = $_______________ 53 42" Pipe 500 LF x $____________/lf = $_______________ Smooth interior and smooth exterior HDPE pipe N-12HC or equal bell & spigot $_______________ 54 48" Pipe 600 LF x $____________/lf = $_______________ 55 60" Pipe 500 LF x $____________/lf = $_______________ Custom PVC Drainage structures, Nyloplast Drain Basin or equal. Basin designed with standard elevation heights $_______________ 56 12" Drain basis (standard elevation 24") (4ea stub outs included) 5 EA x $___________/ea = $_______________ 57 Additional vertical cost per foot 20 LF x $____________/lf = $_______________ 58 15" Drain basis (standard elevation 30") (4ea stub outs included) 5 LF x $____________/lf = $_______________ 59 Additional vertical cost per foot 20 LF x $____________/lf = $_______________Page 41 60 18" Drain basis (standard elevation 36") (4ea stub outs included) 5 EA x $___________/ea = $_______________ 61 Additional vertical cost per foot 20 LF x $____________/lf = $_______________ 62 24" Drain basis (standard elevation 36") (4ea stub outs included) 2 EA x $___________/ea = $_______________ 63 Additional vertical cost per foot 10 LF x $____________/lf = $_______________ 64 30" Drain basis (standard elevation 46") (1ea stub out included) 2 EA x $___________/ea = $_______________ 65 Additional cost per foot 10 LF x $____________/lf = $_______________ PVC in line drainage structures, Nyloplast in line drains or equal $_______________ 66 8" inline structure 5 EA x $___________/ea = $_______________ 67 10" inline structure 5 EA x $___________/ea = $_______________ 68 12" inline structure 5 EA x $___________/ea = $_______________ 69 15" inline structure 5 EA x $___________/ea = $_______________ 70 18" inline structure 5 EA x $___________/ea = $_______________ 71 24" inline structure 2 EA x $___________/ea = $_______________ 72 30" inline structure 2 EA x $___________/ea = $_______________ N-12 Fabricated 45 degree and 90-degree bends- 12"-24" Diameter $_______________ 73 12" 45 bend 5 EA x $___________/ea = $_______________ 74 15" 45 bend 5 EA x $___________/ea = $_______________ 75 18" 45 bend 5 EA x $___________/ea = $_______________ 76 24" 45 bend 5 EA x $___________/ea = $_______________ HDPE Pipe Couplings (Split) $_______________ 77 12" 20 EA x $___________/ea = $_______________ 78 15" 20 EA x $___________/ea = $_______________ 79 18" 20 EA x $___________/ea = $_______________ 80 24" 20 EA x $___________/ea = $_______________ 81 30" 10 EA x $___________/ea = $_______________ 82 36" 10 EA x $___________/ea = $_______________ Slotted corrugated HDPE pipe and couplings $_______________ 83 6" slotted pipe with sock 1000 LF x $____________/lf = $_______________Page 42 84 8" slotted pipe with sock 1000 LF x $____________/lf = $_______________ 85 6" coupling 100 EA x $___________/ea = $_______________ 86 8" coupling 100 EA x $___________/ea = $_______________ 87 6" 45-degree bend 5 EA x $___________/ea = $_______________ 88 8" 45-degree bend 5 EA x $___________/ea = $_______________ Flexible Pipe $_______________ 89 6" Corrugated 50 LF x $____________/lf = $_______________ 90 8" Corrugated 50 LF x $____________/lf = $_______________ 91 6" smooth 50 LF x $____________/lf = $_______________ 92 8" smooth 50 LF x $____________/lf = $_______________ Total Estimated Bid Amount Option Year #1 $_____________________ Item # Description Estimated Quantity Unit Unit Price Total Estimated Bid Corrugated Smooth Inter HDPE pipe N-12 or equal bell and spigot 93 12" Pipe 1,000 LF x $____________/lf = $_______________ 94 15" Pipe 2,000 LF x $____________/lf = $_______________ 95 18"Pipe 2,000 LF x $____________/lf = $_______________ 96 24"Pipe 1,000 LF x $____________/lf = $_______________ 97 30" Pipe 1,000 LF x $____________/lf = $_______________ 98 36" Pipe 500 LF x $____________/lf = $_______________ 99 42" Pipe 500 LF x $____________/lf = $_______________ Smooth interior and smooth exterior HDPE pipe N-12HC or equal bell & spigot $_______________ 100 48" Pipe 600 LF x $____________/lf = $_______________ 101 60" Pipe 500 LF x $____________/lf = $_______________ Custom PVC Drainage structures, Nyloplast Drain Basin or equal. Basin designed with standard elevation heights $_______________ 102 12" Drain basis (standard elevation 24") (4ea stub outs included) 5 EA x $___________/ea = $_______________Page 43 103 Additional vertical cost per foot 20 LF x $____________/lf = $_______________ 104 15" Drain basis (standard elevation 30") (4ea stub outs included) 5 LF x $____________/lf = $_______________ 105 Additional vertical cost per foot 20 LF x $____________/lf = $_______________ 106 18" Drain basis (standard elevation 36") (4ea stub outs included) 5 EA x $___________/ea = $_______________ 107 Additional vertical cost per foot 20 LF x $____________/lf = $_______________ 108 24" Drain basis (standard elevation 36") (4ea stub outs included) 2 EA x $___________/ea = $_______________ 109 Additional vertical cost per foot 10 LF x $____________/lf = $_______________ 110 30" Drain basis (standard elevation 46") (1ea stub out included) 2 EA x $___________/ea = $_______________ 111 Additional cost per foot 10 LF x $____________/lf = $_______________ PVC in line drainage structures, Nyloplast in line drains or equal $_______________ 112 8" inline structure 5 EA x $___________/ea = $_______________ 113 10" inline structure 5 EA x $___________/ea = $_______________ 114 12" inline structure 5 EA x $___________/ea = $_______________ 115 15" inline structure 5 EA x $___________/ea = $_______________ 116 18" inline structure 5 EA x $___________/ea = $_______________ 117 24" inline structure 2 EA x $___________/ea = $_______________ 118 30" inline structure 2 EA x $___________/ea = $_______________ N-12 Fabricated 45 degree and 90-degree bends- 12"-24" Diameter $_______________ 119 12" 45 bend 5 EA x $___________/ea = $_______________ 120 15" 45 bend 5 EA x $___________/ea = $_______________ 121 18" 45 bend 5 EA x $___________/ea = $_______________ 122 24" 45 bend 5 EA x $___________/ea = $_______________ HDPE Pipe Couplings (Split) $_______________ 123 12" 20 EA x $___________/ea = $_______________ 124 15" 20 EA x $___________/ea = $_______________ 125 18" 20 EA x $___________/ea = $_______________ 126 24" 20 EA x $___________/ea = $_______________ 127 30" 10 EA x $___________/ea = $_______________Page 44 128 36" 10 EA x $___________/ea = $_______________ Slotted corrugated HDPE pipe and couplings $_______________ 129 6" slotted pipe with sock 1000 LF x $____________/lf = $_______________ 130 8" slotted pipe with sock 1000 LF x $____________/lf = $_______________ 131 6" coupling 100 EA x $___________/ea = $_______________ 132 8" coupling 100 EA x $___________/ea = $_______________ 133 6" 45-degree bend 5 EA x $___________/ea = $_______________ 134 8" 45-degree bend 5 EA x $___________/ea = $_______________ Flexible Pipe $_______________ 135 6" Corrugated 50 LF x $____________/lf = $_______________ 136 8" Corrugated 50 LF x $____________/lf = $_______________ 137 6" smooth 50 LF x $____________/lf = $_______________ 138 8" smooth 50 LF x $____________/lf = $_______________ Total Estimated Bid Amount Option Year #2 $____

Details

Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents