Similar Projects
Construction of Asphalt Overlay
Infrastructure
Post-Bid
Vilonia, AR

2022 Asphalt
Term Contract, Infrastructure
Post-Bid
AR

Hwy. 25 - Hwy. 5 (Overlay)
Results
AR

Highway 25 - East
Infrastructure
Results
AR

AGFC Barnett Access
Infrastructure
Post-Bid
Heber Springs, AR 72543

Stone Dam Creek Trail
Infrastructure
Results
Conway, AR

High Performance Cold Mix
Infrastructure
Post-Bid

Statewide CLRS Improvements
Infrastructure
Results

Asphalt Overlay of All Paved Surfaces at Carl Stuart Middle School
Infrastructure
Post-Bid
$290,000 est. value
Conway, AR 72034

Beryl Road Improvements
Infrastructure
Results
AR

Asphalt Paving of the Back Drive at Carolyn Lewis Elementary School
Infrastructure
Post-Bid
$200,000 est. value
Conway, AR 72034

Mayflower Overlay
Infrastructure
Results
Mayflower, AR

Hwy. 64 - South (Overlay)
Infrastructure
Results
AR

Vilonia Overlay (S)
Infrastructure
Results
Vilonia, AR

Hwy. 16 – Greers Ferry Lake (S)
Infrastructure
Results
AR

Last Updated 07/11/2022 02:42 AM
Project Title

Guy - Heber Springs Safety Improvements

Physical Address View project details and contacts
City, State (County) Heber Springs, AR 72543 (Cleburne, Faulkner Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose of This Project Is to Adjust Superelevation and Install Two Way Left Turn Lanes, Ultrathin Bonded Wearing Course, and Rumble Stripes on Highway 25 in Cleburne and Faulkner Counties. This Project Consists of Clearing and Grubbing, Removal and Disposal Items, Earthwork, Aggregate Base Course, Achm Base, Binder, and Surface Courses, Ultrathin Bonded Wearing Course, Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Maintenance of Traffic, Minor Drainage, Erosion Control, Extend a Double R.c. Box Culvert (23.23'), Pavement Marking, and Misc. Items. County: Cleburne & Faulkner Length: 8.514 miles in length.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents