Similar Projects
Generator Replacements at Revere High School, Beachmont School and Lincoln School - General Bids
Bidding
$500,000 est. value
Revere, MA 02151

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Transformer Replacement at West Broadway Development
Post-Bid
Less than $120,719 est. value
Boston, MA 02111

Furnish and Install Mini Split AC Unit
Results
Boston, MA 02210

MIS Data Center Air Conditioning Units Replacement
Results
Less than $510,000 est. value
Boston, MA 02129

Electrical Switches, Controls, Colis, Volt Meters and Other Electrical Equipment
Post-Bid
Boston, MA

Switchboard - Low Voltage
Results
Boston, MA

Purchase of One (1) 15KV Drawout Vacuum Circuit Breaker
Post-Bid
Boston, MA 02129

Heating System Closed Loop Treatment
Results
Boston, MA

Automatic Transfer Switch Replacement
Post-Bid
Less than $46,000 est. value
Roxbury, MA

Landside Vehicle Charging Stations Logan International Airport
Results
Less than $1,840,000 est. value
Boston, MA

Boilers Annual Preventative Maintenance, Service Calls, Parts And Components
Post-Bid
Boston, MA

Transfer Switches
Results
Boston, MA 02116

UPS - Uninterruptible Power Supply
Post-Bid
Boston, MA 02129

Provide Preventive Maintenance - General Bid
Results
Less than $7,128,837 est. value
Boston, MA 02108

Reported 09/25/2020 12:00 AM
Project Title

Staff Lounge and Innovation Lab Renovation - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Boston, MA 02108   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $518,788
Plans Available from State Agency - 09/02/20
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. This project is for renovations on the ninth floor for a new innovation conference room and a staff lounge, including kitchenettes. Work includes asbestos abatement, minor demolition, new demountable system furniture, VCT flooring, carpeting, painting, acoustical ceiling, MEP/FP, and miscellaneous carpentry.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents