Similar Projects
Warner and Swasey Senior Living
New Construction - 35,960 SF
Conception
$17,100,000 est. value
Cleveland, OH 44103

Arpi Apartments
New Construction - 39,584 SF
Conception
Cleveland, OH 44106

Belle Oaks Mixed Use Development
New Construction - 1,700,000 SF
Design
$195,000,000 est. value
Richmond Heights, OH 44143

Churchill Gateway
New Construction - 54,000 SF
Design
$13,000,000 est. value
Cleveland, OH 44106

IR 480 - Interchange
Infrastructure
Bidding
$7,960,000 CJ est. value
Cleveland, OH 44109

Bradstreet's Landing Waterfront Improvements Phase 2 - Rebid
Infrastructure
Bidding
$2,465,001 CJ est. value
Rocky River, OH 44116

Trinity Church In Lakewood
Renovation - 24,300 SF
Post-Bid
$6,000,000 est. value
Lakewood, OH 44107

Cuyahoga TAY
New Construction - 51,536 SF
Post-Bid
$8,600,000 est. value
Cleveland, OH 44103

East 79th Street Rehabilitation Woodland Avenue to Chester Avenue
Infrastructure
Results
$3,506,512 CJ est. value
Cleveland, OH 44103

Fire Casualty Loss Repairs at Willson Family 5700-5702-5704 Curtis Court
Renovation
Results
$150,000 to $250,000 est. value
Cleveland, OH 44131

Waterford Bluffs
New Construction - 284,741 SF
Construction
Cleveland, OH 44113

Residential Development
New Construction
Construction
Lakewood, OH 44107

Solon on the Lake Mixed-Use
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Solon, OH 44139

Solon on the Lake Mixed-Use
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Solon, OH 44139

Artcraft Building Redevelopment
Renovation - 260,000 SF
Conception
$20,000,000 est. value
Cleveland, OH 44114

Last Updated 11/03/2022 04:17 PM
Project Title

Driftwood Apartments

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44113   (Cuyahoga County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $37,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of a 4 story, 97-unit apartment building. As of November 3, 2022, this project is in the early planning stages. It will need approval from the Cleveland Planning Commission; however, no meetings have been scheduled at this time. An architect has been selected. Information regarding a general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.

Details

4 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents