Similar Projects
Utilities - US 60
Infrastructure
Design
$1,000,000 CJ est. value
Ponca City, OK 74601

US 11 - Utilities
Infrastructure
Design
$1,000,000 CJ est. value
Ponca City, OK 74601

Resurface - US 60
Infrastructure
Bidding
$5,000,000 CJ est. value
Ponca City, OK 74601

Resurface - US 60
Infrastructure
Bidding
$5,000,000 CJ est. value
Ponca City, OK 74601

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

6th Street – Fresno Ave to Hartford Ave
Infrastructure
Results
Ponca City, OK

6 Months Sidewalk Maintenance
Term Contract
Results
Ponca City, OK

US 60 - Utilities
Infrastructure
Design
$515,000 CJ est. value
Ponca City, OK 74601

Tonkawa Public Schools - New High / Mid-High / Elementary Cafeteria Project
New Construction, Infrastructure - 16,303 SF
Bidding
$680,000 CJ est. value
Tonkawa, OK 74653

Tonkawa Street Improvements to Various Streets
Infrastructure
Post-Bid
$370,000 est. value
Tonkawa, OK

Slabjacking and Subsealing Services
Infrastructure
Results

Bridge Rehabilitation - US 60
Infrastructure
Design
$3,759,812 CJ est. value
Ponca City, OK 74601

Drainage Improvements Project Joe Street, Phases 1 and 2
Infrastructure
Post-Bid
$300,000 CJ est. value
Ponca City, OK 74601

Resurface (Asphalt) US-77
Infrastructure
Results
OK

Last Updated 04/14/2023 02:50 PM
Project Title

Alley Improvement Project and Sidewalk Improvement Project

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $141,126 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 13, 2023, project was awarded to Hembree and Hodgson, awarded amount is $141,125.62. Furnishing all tools, materials and labor and performing the work necessary to reconstruct approximately 300 linear feet of existing 13 foot wide concrete alley with new concrete pavement and to reconstruct approximately 100 linear feet of existing 10 foot wide concrete sidewalk with new concrete. The alley project portion includes 429 square yards of 8 inch dowel jointed high early strength concrete pavement and 8 inch Type A Aggregate Base and 620 square yards of geotextile reinforcement. The sidewalk portion of the project includes 125 linear feet of stepped concrete curb and gutter, 110 square yards of 4 inch concrete sidewalk and structural improvements over basements under the sidewalk. The information for Bidders, Forms of Bids, Form of Contract, Plans, Specifications and Form of Bid Bond, Performance and Statutory Bond, and other contract documents may be examined at the Office of the City Clerk of Ponca City, Oklahoma. The successful bidder shall submit Certification of Insurance for Public Liability and Workers Compensation in the amounts prescribed by Statute with the City of Ponca City named as additional insured. Bids filed as provided herein shall be publicly opened on the above-mentioned time, date and place. All bids shall remain on file at least forty-eight (48) hours thereafter before a contract shall be made and entered into thereon. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of bids, as well as bids received after the time set for opening of bids, shall not be considered and will be returned unopened. All bids submitted must include the word "BID", the name of the bid item or project, and the time and date of the bid opening on the face of the sealed envelope. A cashier's check, a certified check or a security bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to unsuccessful bidders

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents