Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

High-Capacity, Mobile Stormwater Pumps Project
Infrastructure
Bidding
Southwest Ranches, FL 33331

Design and Permitting of Class I Deep Injection Well at Prineville WTP
Infrastructure
Bidding
Port Saint Lucie, FL

Solid Waste Flygt Pump
Post-Bid
FL

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Well Assessment and Rehabilitation
Term Contract, Infrastructure
Bidding
New Smyrna Beach, FL

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Install 4 Drainage Wells - Ocala Nutrient Reduction Project
Infrastructure
Bidding
Ocala, FL 34475

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Raw Water Well #9
Results
Hallandale, FL 33009

Myrtle Avenue Stormwater Pump Replacement
Infrastructure
Bidding
Jacksonville, FL 32260

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Last Updated 10/21/2021 10:06 AM
Project Title

Cypress Bridge Wellfield Improvements Project

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Services for the replacement, demolition and disposal of pumps, motors, fans, louvers, electrical equipment and ancillaries for 10 well sites, as well as replacement, demolition and disposal of 4 existing diesel generators located in 4 well sites and install three new diesel generators (CYB-04, CYB-05, and CYB-08). For one of the well sites (CYB-07) the existing pump motor will be reused, and most electrical equipment will remain in place, including the existing engine generator and for one well site (CYB-09) the existing engine generator will be demolished and disposed of, without replacement.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Facility Storm Drainage, Sump Pumps, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents