Similar Projects
One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Merced Avenue Greenway Project
Infrastructure
Bidding
$10,000,000 CJ est. value
South El Monte, CA 91733

Merced Avenue Greenway Project
Infrastructure
Bidding
$10,000,000 CJ est. value
South El Monte, CA 91733

Valley View Avenue & Rosecrans Avenue Intersection Improvements
Infrastructure
Post-Bid
$617,000 to $620,000 est. value
Santa Fe Springs, CA 90670

RFP D/B - San Gabriel Valley Aquatic Center
New Construction, Infrastructure
Post-Bid
$26,000,000 CJ est. value
La Puente, CA 91744

Melrose Streetscape Project
Alteration
Results
West Hollywood, CA 90038

Place Culvert, Replace Drainage System, Reconst Roadway and Embankment
Infrastructure
Results
$28,000,000 est. value
CA

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
$97,000,000 CJ est. value
West Hollywood, CA 90046

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

Adjust vertical clearance with roadway excavation and place JPCP
Infrastructure
Results
$2,640,000 est. value
CA

Last Updated 04/26/2023 05:37 PM
Project Title

Concrete Repair Program

Physical Address View project details and contacts
City, State (County) West Hollywood, CA 90046   (Los Angeles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $445,348 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 26, 2023, project was awarded to Stance Construction Company, awarded amount is $445,348.20. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work include removal and replacement of broken and damaged P.C.C. sidewalks, rolled curbs, curbs, gutters, residential and commercial driveways, intersection crossgutter, curb ramps on street corners to meet requirements of the ADA with truncated domes, removal and replacement of damaged Tree Well Adaptive Paving System into the tree wells on Santa Monica Blvd, removal and construction of 8" thick P.C.C. pavement over 6" compacted subgrade, install curb drain outlets, curb marking, and other items not mentioned that are required by the plans and specifications. Proposals must be accompanied by a proposal guarantee consisting of a certified or cashier's check or bid bond payable to the AGENCY in the amount not less than ten percent (10%) of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a contract is awarded fails or refuses to execute the contract documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall be forfeited to the AGENCY. The City of West Hollywood reserves the right to reject any and all proposals or bids or to waive any irregularities or informalities in any bids or in the bidding should it deem this necessary for the public good, and also the bid of any Bidder who has been delinquent or unfaithful in any former contract with the City of West Hollywood and to take all bids under advisement for a period of ninety (90) days. No bidder may withdraw its bid for a period of ninety (90) days after the date from the opening thereof. The award of contract, if made, will be to the lowest responsible Bidder as determined solely by the City of West Hollywood.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents