Last Updated | 04/26/2023 05:37 PM |
Project Title | Concrete Repair Program |
Physical Address | View project details and contacts |
City, State (County) | West Hollywood, CA 90046 (Los Angeles County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $445,348 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 26, 2023, project was awarded to Stance Construction Company, awarded amount is $445,348.20. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work include removal and replacement of broken and damaged P.C.C. sidewalks, rolled curbs, curbs, gutters, residential and commercial driveways, intersection crossgutter, curb ramps on street corners to meet requirements of the ADA with truncated domes, removal and replacement of damaged Tree Well Adaptive Paving System into the tree wells on Santa Monica Blvd, removal and construction of 8" thick P.C.C. pavement over 6" compacted subgrade, install curb drain outlets, curb marking, and other items not mentioned that are required by the plans and specifications. Proposals must be accompanied by a proposal guarantee consisting of a certified or cashier's check or bid bond payable to the AGENCY in the amount not less than ten percent (10%) of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a contract is awarded fails or refuses to execute the contract documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall be forfeited to the AGENCY. The City of West Hollywood reserves the right to reject any and all proposals or bids or to waive any irregularities or informalities in any bids or in the bidding should it deem this necessary for the public good, and also the bid of any Bidder who has been delinquent or unfaithful in any former contract with the City of West Hollywood and to take all bids under advisement for a period of ninety (90) days. No bidder may withdraw its bid for a period of ninety (90) days after the date from the opening thereof. The award of contract, if made, will be to the lowest responsible Bidder as determined solely by the City of West Hollywood. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |