Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

National Architecture/Engineering/Interiors (IDIQ) Contract
Bidding
Less than $25,000,000 est. value

National Architecture/Engineering/Interiors (IDIQ) Contract
Bidding
Less than $25,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Post-Bid
$70,000 to $10,000,000 est. value
Washington, DC

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Post-Bid
$70,000 to $10,000,000 est. value
Washington, DC

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Mahomet Barber Park Design Phase 1 Division A
New Construction
Bidding
Mahomet, IL 61853

National Guard Bureau, Region 6, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Post-Bid
$110,000 to $35,000,000 est. value

Florida Windspeed UFC Update
Results

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Engineering Services for Garden Hills Drainage and Lighting
Infrastructure
Bidding
Champaign, IL

National Guard Bureau, Region 3, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Horizontal Projects
Post-Bid
$100,000 to $90,000,000 est. value

Last Updated 09/10/2021 04:59 PM
Project Title

A/E Services for Forum Fitness Center Renovation & Expansion

Physical Address View project details and contacts
City, State (County) Rantoul, IL 61866   (Champaign County)
Category(s) Entertainment/Recreation, Professional Services
Sub-Category(s) Architectural, Engineering, Fitness Center
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PHASE I: PRELIMINARY DESIGN AND PROBABLE CONSTRUCTION COSTS The architect/engineer shall develop a design, with accompanying cost estimates, to provide a 3000 square foot indoor recreation center addition that will include an open space concept and is to be used as a multi-purpose area with estimated dimensions of 75’ x 40’. In addition to the recreation center addition, the grant also includes HVAC installation, new lockers in men’s and women’s locker rooms, expansion of weight room and cardio room into existing racquetball courts, window installation, steam room renovations and installation of new electrical and flooring. The deadline for completion of Phase 1 is January 29, 2021. PHASE II: SCOPE OF SERVICES FORUM FITNESS CENTER RENOVATION & EXPANSION PHASE III: BIDDING & CONSTRUCTION ADMINISTRATION PHASE IV: RESIDENT INSPECTION

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents