Similar Projects
Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Salt and Gravel Storage Structure
New Construction, Infrastructure
Post-Bid
$50,000 CJ est. value
Vermont, IL 61484

2022 Cuba Road District - II
Infrastructure
Results
$188,963 CJ est. value
Cuba, IL 61427

Spray Patching
Infrastructure
Results
$56,269 CJ est. value
Canton, IL 61520

Deliver and Install Proposal of Road Repair
Infrastructure
Post-Bid
$300,000 CJ est. value
Lewistown, IL 61542

Agricultural Management, Agricultural Fieldside Mowing, And Fence Installation and Repair At Fulton County, Illinois
Infrastructure
Results
$330,072 CJ est. value
Cuba, IL 61427

Culvert Extension
Infrastructure
Post-Bid
$500,000 CJ est. value
Canton, IL 61520

Astoria Sanitary Sewer Rehabilitaion
Infrastructure
Results
$99,790 CJ est. value
Astoria, IL 61501

Furnish and Apply
Infrastructure
Post-Bid
$500,000 CJ est. value
Fairview, IL 61432

Parking Lot Paving
Infrastructure
Results
$542,008 CJ est. value
Table Grove, IL 61482

Contract Maintenance
Infrastructure
Post-Bid
$300,000 CJ est. value
Canton, IL 61520

Headwall Removal and Replacement
Infrastructure
Results
$938,577 CJ est. value
Avon, IL 61415

Contract Maintenance
Infrastructure
Post-Bid
$400,000 CJ est. value
Farmington, IL 61531

Construction of Quonset Hut-style Storage Building on Village Property
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Vermont, IL 61484

Drainage Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Bryant, IL 61519

Last Updated 05/13/2023 10:31 PM
Project Title

Track Surfacing

Physical Address View project details and contacts
City, State (County) Table Grove, IL 61482   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Bids shall be accompanied by a bid bond in the amount of 5% of the total base bid. A certified check or bank draft, payable to the order of the vit cusd no. 2 equal to this amount will be an acceptable bid bond. Pursuant to section 10-20.21 of the school code, awards will be made to the lowest responsible bidder as reasonably determined by the board of education considering conformity with specifications, terms of delivery, quality and serviceability. In evaluating these factors, the board will necessarily consider and compare (relative to the other bidders) the experience of the bidder on this type of project or similar projects, and the performance history of the bidder regarding conformity with specifications, meeting terms of delivery and quality of work and the performance history and ability of the bidder to complete the project on time, to service the product (including response time to service calls) and workmanship on the project. The board of education is not obligated to accept the lowest dollar bid and reserves the right to reject any and all bids or to waive any informalities, irregularities, technicalities, or defects in any bid should the board deem it in the best interest of the school district to do so. Awards, if made, will be made within sixty (60) days following the opening of these bids. Labor Statutes, Prevailing Wage Rates - In the employment and use of labor, contractors will be required to conform to all Illinois statutory requirements regarding labor and to pay not less than the prevailing rate of wages for all classifications of labor as determined by the Illinois Department of Labor. Prevailing wages are subject to change. Rates are available at the office of the Fulton County Clerk, 100 North Main Street, Lewistown, Illinois 61542. Certified payroll records shall comply with the requirement of 820 ILCS 130/5. Prospective bidders must comply with 30 Illinois Compiled Statutes 570 et seq. regarding preference to Illinois citizens or public works projects. The bidder shall comply with the applicable provisions of the Illinois Human Rights Act specifically including but not limited to the requirement of 775 ILCS 5/2-105 that bidder shall have a written sexual harassment policy in place including at a minimum those requirements of such statutory provision. Said policy must be filed with the VIT CUSD No. 2 prior to commencing work. The bidder shall comply with the requirement of 820 ILCS 265/15 that bidder shall have a written substance abuse prevention program in place including at a minimum those requirements of such statutory provision. Said program must be filed with the VIT CUSD No. 2 prior to commencing work. All construction work on this project must be completed on or before August 4, 2023. Board of Education VIT Community Unit School District #2 Table Grove, Illinois

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents