Similar Projects
East Hawaii Historic Preservation Center - City of Hilo
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Kapolei, HI 96707

Friends of Waipahu Cultural Garden Park, O'ahu - State of Hawaii
Renovation, Infrastructure
Conception
$200,000 CJ est. value
Waipahu, HI 96797

Repair and Stabilize Failing Eroded Sections of McCornack Gulch, Schofield Barracks
Infrastructure
Design
$1,000,000 CJ est. value
Schofield Barracks, HI 96857

1500 Kapiolani
New Construction, Infrastructure
Design
$542,000,000 CJ est. value
Honolulu, HI 96814

Whitmore Avenue Sidewalk Improvements Phase 2
Infrastructure
Bidding
$142,000 CJ est. value
Whitmore Village, HI 96786

Pavement Repairs at Kaumalapau Harbor
Infrastructure
Bidding
$300,000 CJ est. value
Honolulu, HI 96813

Waiomao Homestead Road 8-inch Main
Infrastructure
Post-Bid
$2,500,000 CJ est. value
Honolulu, HI 96816

Keolu Hills Water System Improvements - Part II
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Kailua, HI 96734

Hawaii Youth Correctional Facility - Water System Improvements
Infrastructure
Results
$1,279,130 CJ est. value
Honolulu, HI 96813

Tai Lee Reservoir Spillway Rehabilitation and Vegetation Clearing
Infrastructure, Alteration
Results
$1,520,000 est. value
Waimanalo, HI 96795

FY22 MCA - Child Development Center Schofield Barracks, Oahu, Hawaii
LEED Certification, New Construction, Infrastructure - 37,300 SF
Construction
$44,698,307 CJ est. value
Honolulu, HI 96818

Dry Dock 3 Replacement
New Construction, Infrastructure
Construction
$2,800,000,000 CJ est. value
Honolulu, HI 96818

Queen's Medical Center Expansion
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Honolulu, HI 96813

Costco Distribution Center - Ho'opili Business Park
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Ewa Beach, HI 96706

Stadium Development District (SDD) - State of Hawaii
New Construction, Infrastructure
Conception
$350,000,000 CJ est. value
Honolulu, HI 96813

Last Updated 10/11/2023 09:09 AM
Project Title

Waikiki Aquarium Discharge System Upgrade

Physical Address View project details and contacts
City, State (County) Honolulu, HI 96815   (Honolulu County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $7,058,888 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 10, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Scope of Work : The project shall in general consist of, but is not limited to, mobilization and demobilization, installation of two (2) onsite injection wells and associated appurtenances, equipment for disposal of Aquarium exhibit wastewater (e.g., pumps, filters, flowmeters), construction of three (3) housing structures for new equipment, upgrading the piping and drainage structures inside the existing building and the property, sitework, fencing, concrete, masonry, metal fabrications, carpentry, fluid-applied roofing, flashing and sheet metal, drywall, painting, mechanical, electrical, relocation and restoration of existing utilities and other features as required, and miscellaneous related work, as shown on the Plans and Technical Specifications. 3-1-31:06 BID SECURITY : This proposal is accompanied with a bid security in the amount of 5% of the total amount proposed. The Bidder shall use the attached Surety Bid Bond form. LIQUIDATED DAMAGES If the Contractor fails to complete the work or any portion of the work within the time or times fixed in the contract or any extension thereof, the Contractor shall pay to the University $ 500.00 per each calendar day of delay. The liquidated damages constitute a reasonable estimate of the actual damages to be incurred by the University and are not meant to be a penalty. Substitution Requests Requests for substitutions regarding the IFB and its requirements, must be submitted to the Technical Representative of the Procurement Officer (TRPO), Lise Ditzel-Ma via E-mail at lisedm@hawaii.edu no later than 4:00 p.m. (HST) on July 28, 2023. The estimated construction cost for this project is $250,000.00 or more. The University reserves the right to reject any or all proposals and to waive any defects when in the Director's opinion such rejections or waiver will be for the best interest of the public. Question Deadline 08/16/2023 at 4:00 PM HT

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents