Similar Projects
FM270 Public Boat Ramp Renovation - PK1804 - City of League City
Infrastructure
Conception
$920,000 CJ est. value
League City, TX 77573

Bay Area Boulevard 12" Sewer Improvements FM/LS - WW1702 - City of League City
Infrastructure
Conception
$2,159,643 CJ est. value
Friendswood, TX 77546

ReGen III USGC Refinery
New Construction, Infrastructure
Design
$293,000,000 CJ est. value
Texas City, TX 77590

Water, Sanitary Sewer, and Drainage Facilities to Serve Westland Ranch, Section 2 and Magnolia Bayou Drive
Infrastructure
Design
$600,000 CJ est. value
Texas City, TX 77590

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Construction Manager at Risk - TAMUG Engineering Classroom and Research Building
New Construction, Infrastructure - 51,300 SF
Post-Bid
$44,992,125 CJ est. value
Galveston, TX 77550

Sanitary Sewer Pipe Bursting Phase 2
Infrastructure
Results
$228,339 CJ est. value
Hitchcock, TX 77563

Sanitary Sewer Pipe Bursting Phase 2
Infrastructure
Results
$228,339 CJ est. value
Hitchcock, TX 77563

Tannos Medical Building
New Construction, Infrastructure - 106,908 SF
Construction
$28,000,000 est. value
Friendswood, TX 77546

Kermit Courville Stadium
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Galveston, TX 77550

Dutch Bros #TX14901 / League City
New Construction, Infrastructure - 950 SF
Pending Verification
$750,000 CJ est. value
League City, TX 77573

Dutch Bros #TX14901 / League City
New Construction, Infrastructure - 950 SF
Pending Verification
$750,000 CJ est. value
League City, TX 77573

LCP and Walker Street Intersection Improvements - ST1913 - City of League City
Infrastructure
Conception
$2,103,434 CJ est. value
League City, TX 77573

Whataburger at Santa Fe
New Construction, Infrastructure - 3,746 SF
Design
$2,500,000 CJ est. value
Santa Fe, TX 77510

Landscape Renovations at the Galveston College Main Campus
Infrastructure
Post-Bid
$18,000 CJ est. value
Galveston, TX 77550

Last Updated 10/18/2023 10:07 AM
Project Title

Cobblestone Subdivision - Community Park

Physical Address View project details and contacts
City, State (County) Texas City, TX 77591   (Galveston County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Landscape Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work of the Contract Documents includes the following: New construction of playground, splash pad, pavilion, sidewalks, sitework, wet utilities, electrical, grading & drainage, landscape, & irrigation. Texas Government Code provides that any political subdivision of the State of Texas shall ascertain the general prevailing wage rate received by the classes of workers employed on projects similar to this Project and shall specify in the call for Bids and in the Contract Documents the minimum wage rates which must be paid for each type of worker. This statute further provides that the Contractor or subcontractors must pay, as penalty to Owner Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. Owner is authorized to withhold from the Contractor the amount of this penalty from any payment due under the Contract Documents. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Boards judgment will be most advantageous to the District and result in the best and most economical completion of the Project. Each Bid must be accompanied by a bid bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than two (2) percent of the total amount bid (the Bid Security), as a guarantee that the successful bidder will enter into the Contract and execute the payment and performance bonds on the forms provided and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the successful bidder. Bid Securities will be returned to all but the three (3) most qualified, responsible bidders within three (3) days after opening of Bids, and the latter's Bid Securities will be returned after complete execution of the Contract Documents. If the successful bidder does not enter into the Contract after notice of award, then the bidder's Bid Security will be forfeited and will be retained by Owner. If the award of the Contract to the successful bidder is cancaled or not executed for any reason, the Owner may accept the next lowest bid and proceed with the next-lowest successful bidder. Certain taxes, licenses, fees, and other similar items are part of the cost of the Work, and it is bidder's responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to same. The prices, sums, rates, and other charges set forth in the bidders Bid must cover and include all such costs

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents