Similar Projects
Bridge Replacement - Oak Street - City of Dover
Demolition, New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Rollinsford, NH 03869

Water Main Replacement - Littleworth Road - City of Dover
Infrastructure
Conception
$3,600,000 CJ est. value
Dover, NH 03820

74 Main Street Mixed Use Building
Demolition, New Construction, Infrastructure - 31,000 SF
Design
$4,000,000 CJ est. value
Durham, NH 03824

Central Avenue Apartments
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Dover, NH 03820

New Hampshire Farm Museum Parking Lot
Alteration
Post-Bid
Milton, NH 03851

2022 Paving
Infrastructure
Post-Bid
$50,000 est. value
Barrington, NH

Whittier Street Sidewalk Improvements
Results
Dover, NH

Bellamy Ridge (Red Barn Drive) Completion
Infrastructure
Results
Dover, NH 03820

Fownes Mill Condominiums
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Rochester, NH 03867

Fownes Mill Condominiums
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Rochester, NH 03867

Cocheco Mixed-use Development
New Construction, Infrastructure - 25,000 SF
Pending Verification
$200,000,000 CJ est. value
Dover, NH 03820

Cocheco Mixed-use Development
New Construction, Infrastructure - 25,000 SF
Pending Verification
$200,000,000 CJ est. value
Dover, NH 03820

Street Reconstruction - Oak/Ham/Ela - City of Dover
Infrastructure
Conception
$2,000,000 CJ est. value
Dover, NH 03820

New England Sports Hub
New Construction, Infrastructure - 143,000 SF
Design
$33,000,000 CJ est. value
Somersworth, NH 03878

Paving of the Farmington High School Parking Lot
Infrastructure
Post-Bid
$300,000 est. value
Farmington, NH 03835

Last Updated 01/24/2023 05:07 PM
Project Title

FY2023 Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Somersworth, NH 03878   (Strafford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $106,925 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Any questions related to the requested work should be directed to Scott Smith, Deputy City Manager/Director of Finance and Administration via email at sasmith@somersworthnh.gov by 4:30 PM on Tuesday January 10, 2023. The City of Somersworth requests that sidewalk improvement work begin on Monday May 1, 2023 with a substantial completion date no later than Friday July 14, 2023 and a final completion date of Friday August 18, 2023. Bid Bonds/Surety is required to be submitted at the time of Bid in the amount of 5% (minimum) of the bid price and shall be valid for sixty (60) calendar days from the date bids are due. Payment Bond is required to be submitted within ten (10) business days from the date of the City's Notice of Award in the amount of 100% of the estimated contract price. Performance Bond is required to be submitted within ten (10) business days from the date of the City's Notice of Award in the amount of 100% of the estimated contract price. Pending budget availability, the anticipated Base Bid work is as follows: 1. Reconstruct asphalt sidewalk along West High Street from Maple Street to Cemetery Road (1,900 ft). 2. Reconstruct asphalt sidewalk along West High Street from Cemetery Road crosswalk to SAU Building driveway (40 ft). 3. Reconstruct asphalt sidewalk on Bartlett Avenue from Cass Street to Guy Street (500 ft). 4. Reconstruct the existing asphalt sidewalk and concrete sidewalk and curbing along both sides of Green Street from Franklin Street to Indigo Hill Road (2,400 ft). Pending budget availability, the anticipated Bid Alternative work is as follows: Bid Alternative #1 is the same scope as base bid #4 but includes installing all concrete sidewalk on both sides of Green Street from Franklin Street to Myrtle Street in addition to replacing sidewalk south of Myrtle Street Bid results - Base Bid 1 - GMI Asphalt - $90,905.00 Base Bid 2 - GMI Asphalt - $16,020.00

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents