Similar Projects
Vermillion Acres Senior Housing
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Hastings, MN 55033

2020 Assessment Job No. 1 Main Street Utility and Street Reconstruction
Post-Bid
$1,700,000 est. value
Greenbush, MN

Grading, Aggregate Base, Bituminous Surfacing, Concrete Curb and Gutter, Concrete Walks, Water Main, Sanitary Sewer, and Related Restoration
Post-Bid
MN

Phase 3A-2 Infrastructure Improvements
Results
Tracy, MN

2021 Infrastructure Improvements
Results
$1,500,000 to $2,000,000 est. value
MN

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

Edgewood Avenue, St Peter Avenue, Stanley Avenue and Ulstad Avenue Reconstruction
Results
$2,500,000 to $4,000,000 est. value
Albert Lea, MN 56007

Blanket Flower SNA Gravel Pit Reclamation
Post-Bid
MN

2021 Site Improvements
Results
Monticello, MN 55362

Sauk Rapids Area Public Water Access
Term Contract
Post-Bid
Sauk Rapids, MN

2020 City Project No. 2 Campground Expansion
Results
$600,000 est. value
Warroad, MN

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Last Updated 08/30/2022 12:10 PM
Project Title

2022 Sanitary Sewer and Water Main Improvements

Physical Address View project details and contacts
City, State (County) Vernon Center, MN 56090   (Blue Earth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $420,000 [brand] Estimate
Plans Available from Copy Center - 08/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

Major quantities for the Work include: 310 TON AGGREGATE SURFACING 1 EACH SANITARY BYPASS 840 LF 8 INCH PVC SANITARY SEWER MAIN 1,370 LF 10 INCH HDPE SANITARY SEWER (PIPE BURST) 270 LF 14 INCH HDPE SANITARY SEWER (PIPE BURST) 21 EACH SANITARY SEWER SERVICES 1 EACH TEMPORARY WATER SERVICE 2 EACH FURNISH AND INSTALL HYDRANT 6 EACH FURNISH AND INSTALL 6 INCH GATE VALVE 1,810 LF 6 INCH WATER MAIN (HDD OR OPEN CUT) Additional Description: Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. A Contractor responding to these Bidding Documents must submit to the Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. This Work shall be subject to minimum wages and labour standards in accordance with Federal Davis Bacon and Minnesota prevailing wages. The City of Vernon Centre reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City of Vernon Centre. The Bidding Documents may be viewed for no cost at website, by selecting the Project Bid Information link at the bottom of the page and the View Plans option from the menu at the top of the selected project page. Digital image copies of the Bidding Documents are available at website for a fee of $30. These documents may be downloaded by selecting this project from the "Project Bid Information" link and by entering. For this project, bids will ONLY be received electronically. Contractors submitting an electronic bid will be charged an additional $30 at the time of bid submission via the online electronic, To access the electronic Bid Worksheet, download the project document and click the online bidding button at the top of the advertisement. Prospective bidders must be on the plan holders list for bids to be accepted. Bids shall be completed according to the Bidding Requirements prepared by SEH dated August 2, 2022.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents