Similar Projects
Chico Municipal Airport Groundwater Remediation - 45052 - City of Chico
Infrastructure
Conception
$501,022 est. value
Chico, CA 95973

Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Agricultural Well Repair Services
Infrastructure
Bidding
Chowchilla, CA

Well No. 34 - Drilling of a Municipal Water Well Project
Infrastructure
Bidding
$917,235 est. value
Porterville, CA

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Mission Basin Groundwater Purification Facility (MBGPF) Well Expansion And Brine Minimization Phase 1 - City of Oceanside
Addition, Infrastructure
Design
$6,000,000 est. value
Oceanside, CA

Washington Well Improvements: Well Drilling (Phase I)
Infrastructure
Bidding
$3,340,000 est. value
Santa Ana, CA 92701

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

On-Call Construction Services for Wells/Pumps Repair and Rehabilitation
Infrastructure
Bidding
Long Beach, CA

Install Chill Water Pumps
Term Contract
Post-Bid
CA 95652

Last Updated 06/23/2022 07:55 AM
Project Title

Drilling and Construction of Monitoring Wells

Physical Address View project details and contacts
City, State (County) Tipton, CA   (Tulare County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Drilling and Construction of (4) Monitoring Wells

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents