Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

stayAPT Suites / Normal
New Construction, Infrastructure - 56,900 SF
Bidding
$7,000,000 CJ est. value
Normal, IL 61761

Bloomington and Normal Water Reclamation District
Infrastructure
Bidding
$200,000 CJ est. value
Bloomington, IL 61701

Street Maintenance - Heat Scarification, Sealcoating and Fog coating
Infrastructure
Post-Bid
Hudson, IL

110,000 Gallon Standpipe Rehabilitation
Infrastructure
Post-Bid
$500,000 CJ est. value
Arrowsmith, IL 61722

RR-21-4821 Pavement Repairs
Infrastructure
Results

Locust Street CSO Elimination and Water Main Replacement Phase III
Infrastructure
Results
Bloomington, IL 61701

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Constitution Trail Extension - Lafayette Street to Hamilton Road - 40100100-70051 - City of Bloomington
Infrastructure
Conception
$320,000 CJ est. value
Bloomington, IL 61704

Bloomington Normal Water Reclamation District - Interceptor Sewer Grit Evaluation 2023
Infrastructure
Bidding
$100,000 CJ est. value
Bloomington, IL 61701

Last Updated 05/09/2023 02:33 AM
Project Title

Bridge Superstructure Replacement at Kickapoo Creek

Physical Address View project details and contacts
City, State (County) Normal, IL 61761   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,231,946 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Superstructure Replacement at Kickapoo Creek 1 Mile North of US 136. Region 3 District 5 Federal Project # HBFPBXCS(962) County(s) McLean Key Route(s) FAS 1476 Marked Route(s) OLD US 51 Section(s) 55-BR-1 State Job #(s) C-95-055-20 PPS #(s) 5-52830-1000 Completion Date: 85 Working Days Questions not accepted as of February 28, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 17, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 012 - Bridge Superstructure Replacement at Kickapoo Creek

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents