Similar Projects
Hanna Steel Manufacturing Plant Addition
Addition, Demolition, Infrastructure - 9,000 SF
Design
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Performing Arts Academic Center
New Construction, Infrastructure
Bidding
$110,000,000 CJ est. value
Tuscaloosa, AL 35401

Performing Arts Academic Center
New Construction, Infrastructure
Bidding
$110,000,000 CJ est. value
Tuscaloosa, AL 35401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Oliver-Barnard and Tuomey Halls Renovations and Addition - University of Alabama
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Tuscaloosa, AL 35401

Brookwood Parkway Water Main
Infrastructure
Results
Vance, AL 35490

AMI Meter Cables
Alteration
Results
$26,600 est. value
Tuscaloosa, AL

Crisstown Road Water Main Replacement
Infrastructure
Construction
$200,000 est. value
Tuscaloosa, AL

Water Main Relocation
Infrastructure
Construction
Northport, AL

Element Hotel / Tuscaloosa
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Tuscaloosa, AL 35401

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

Parking Lot Improvements - Phase 1
Infrastructure
Bidding
$76,000 CJ est. value
Tuscaloosa, AL 35401

Citizens Water Service - Water Main Extension
Infrastructure
Post-Bid
Vance, AL

Additional Lanes, Access Management, and Bicycle/ Pedestrian Improvements
Infrastructure
Results
$629,718 est. value
Tuscaloosa, AL

2021 American Rescue Plan Act, Meter Replacement Project- Contract A, B, C
Infrastructure
Construction
$421,268 CJ est. value
Buhl, AL 35446

Last Updated 03/31/2023 11:09 AM
Project Title

2023 Belk Water Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35401   (Tuscaloosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $425,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

***As of March 31, 2023. Docs not available yet no new bid date has been established. The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, and Form of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the office of the engineer. Any questions concerning the project shall be directed to the Engineer, McGiffert and Associates, LLC. Copies may be obtained at the office of McGiffert and Associates, LLC located at 2814 Stillman Boulevard, Tuscaloosa, AL 35401 upon payment of $50.00 for each set. Any unsuccessful bidder, upon returning such set promptly and in good condition, will be refunded their payment, and any non-bidder upon so returning such a set will be refunded $0.00. The owner reserves the right to waive any informalities or to reject any or all bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents