Similar Projects
Project Silver
New Construction, Infrastructure
Conception
Douglasville, GA

Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

Blastec - Site Only
Renovation
Design
Cumming, GA 30041

Rough Grading Phase 1A and 1B of Stanton Springs North (Rivian)
Infrastructure
Bidding
$400,000 est. value
Social Circle, GA

Electric Utility Right-Of-Way Clearing
Term Contract
Post-Bid
Covington, GA

Engineering Services For Site Preparation
Post-Bid
Jeffersonville, GA 31044

Duluth High School - Softball Stadium and Site Preparation
Results
Duluth, GA 30096

Lanier Islands Conference Center - Phase 1 - Site Preparation
Results
Buford, GA

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Winder Retail Center - Site
New Construction
Construction
Winder, GA

Microsoft Data Center / Palmetto
New Construction, Infrastructure, Alteration
Conception
$27,000,000 est. value
Palmetto, GA 30268

Pickle & Social
Infrastructure
Design
Buford, GA 30519

Site Preparation and Restoration for Portable Classrooms and Miscellaneous Paving or Patching
Post-Bid
Atlanta, GA 30339

Re-Grading the Existing Gravel Parking Lot at Chattahoochee Pointe Park
Results
$10,000 to $18,000 est. value
Suwanee, GA 30024

Reported 07/20/2022 12:00 AM
Project Title

On-Call Boring Services

Physical Address View project details and contacts
City, State (County) Brunswick, GA   (Glynn County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing all labor, tools, equipment and incidentals required to bore complete in place pipes in sizes 2", 4", 6", and 8". Pipe materials will be provided by JWSC. Pricing shall be per linear foot. Vendor must be licensed State of Georgia underground utility contractors. Selected vendor is expected to schedule boring work within (3) weeks of purchase order approval by JWSC. All permits (including traffic control with City of Brunswick or Glynn County) are the responsibility of the contractor. Questions regarding this solicitation shall be made in writing to the Purchasing Director, Pam Crosby, via email: pcrosby@bgjwsc.org. All responses to submitted questions will be issued via Addendum to pre-bid attendees and posted on the JWSC website for reference.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents