Similar Projects
New Jail Development - Sarpy County
New Construction, Infrastructure - 146,000 SF
Design
$68,500,000 CJ est. value
Papillion, NE 68046

The Bridge Flats
New Construction, Infrastructure - 18,000 SF
Design
$13,000,000 CJ est. value
Bellevue, NE 68005

SATCOM - MILSTAR Building OFFUT AFB
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Bellevue, NE 68123

SATCOM - MILSTAR Building OFFUT AFB
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Bellevue, NE 68123

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

SCCWWA Phase 1A - Lift Stations (LS), Force Mains (FM), & Zweibel Creek - 3 Interceptor (ZC-3)
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Springfield, NE 68059

Aspen Creek North - Phase 2 Water Main Improvements
Infrastructure
Results
Gretna, NE

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Crisis Stabilization Center - Sarpy County
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Bellevue, NE 68005

RFP - Sewer Rate Study
Term Contract
Bidding
La Vista, NE 68128

Southern Sarpy County Regional Wastewater System - Phase 1A - LS & FM
New Construction, Infrastructure
Post-Bid
$40,000,000 CJ est. value
Springfield, NE 68059

Building V Water Main Relocation Nebraska Crossing Outlets
Infrastructure
Results
Gretna, NE

R&R Commerce Park South Additional Phases / Sarpy Industrial / Papillion
New Construction, Infrastructure - 862,000 SF
Pending Verification
$449,000,000 CJ est. value
Richland Viii, NE 68138

Last Updated 11/24/2022 04:03 AM
Project Title

North Shore 2 Water Section 1

Physical Address View project details and contacts
City, State (County) Papillion, NE 68046   (Sarpy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,421,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: SOUTH 117TH STREET & LINCOLN ROAD Sealed proposals will be received at the office of Lamp Rynerson for the furnishing of all labor, tools, materials, equipment, and all else necessary to construct properly all of the improvements within the improvement generally designated WATER, SECTION 1, Sanitary and Improvement District No. 341 of Sarpy County, Nebraska NORTH SHORE 2. At such hour, or as soon as practicable thereafter, the bids will be publicly opened, read aloud and tabulated, in the presence of all bidders, and consider the bids received for the furnishing of such labor, materials, and equipment necessary for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listed below and other related preparatory and subsidiary work from issuance of the Notice to Proceed: ITEM NO. BID ITEM DESCRIPTION APPROXIMATE QUANTITY UNIT PRICE TOTAL INTERIOR WATER MAIN 1 CONSTRUCT 8" D.I.P. 7,700 LF $65.00 $500,500.00 2 CONSTRUCT HYDRANT, GATE VALVE AND TEE ASSEMBLY 16 EA $7,500.00 $120,000.00 3 CONSTRUCT 8"x8"x8" M.J. TEE ASSEMBLY AND BACKING BLOCK 10 EA $900.00 $9,000.00 4 CONSTRUCT 8" M.J. GATE VALVE AND BOX 32 EA $2,200.00 $70,400.00 5 CONSTRUCT 8" x 11.25 DEGREE BEND WITH BACKING BLOCK 15 EA $685.00 $10,275.00 6 CONSTRUCT 8" x 22.5 DEGREE BEND WITH BACKING BLOCK 10 EA $775.00 $7,750.00 7 CONSTRUCT 8" x 45 DEGREE BEND WITH BACKING BLOCK 5 EA $930.00 $4,650.00 8 CONSTRUCT 8" x 90 DEGREE BEND WITH BACKING BLOCK 1 EA $1,000.00 $1,000.00 9 CONSTRUCT 12"X12"X8" LIVE TAP TEE ASSEMBLY 1 EA $11,100.00 $11,100.00 10 REMOVE AND SALVAGE END OF MAIN HYDRANT 1 EA $500.00 $500.00 11 CONSTRUCT CHLORINE TUBE 1 EA $2,070.00 $2,070.00 12 CONSTRUCT SAMPLE TAP 1 EA $370.00 $370.00 13 CONSTRUCT SILT FENCE 1,000 LF $4.00 $4,000.00 14 SEEDING - TYPE "TEMPORARY SEED MIX" 3 AC $600.00 $1,800.00 15 STRAW MULCH 3 AC $600.00 $1,800.00 16 REIMBURSEMENT FOR WATER MODELING AND PERMIT FEES 1 LS $10,000.00 $10,000.00 17 CONTRACTOR FEE FOR REIMBURSEMENT COORDINATION 1 LS $500.00 $500.00 CONTINGENCY $37,785.00 SUBTOTAL INTERIOR WATER MAIN $793,500.00 CORNHUSKER RD WATER MAIN 101 REMOVE, SALVAGE AND REINSTALL HINGE JOINT MESH FENCING 250 LF 10.00 $2,500.00 102 REMOVE, SALVAGE AND REINSTALL GATE 1 EA $250.00 $250.00 103 REMOVE AND REPLACE 5" PCC SIDEWALK 100 SF $20.00 $2,000.00 104 REMOVE AND REPLACE 7" PCC DRIVEWAY 50 SY $200.00 $10,000.00 105 CONSTRUCT 12" D.I.P. 1,490 LF $95.00 $141,550.00 106 CONSTRUCT HYDRANT, GATE VALVE AND TEE ASSEMBLY 3 EA $7,600.00 $22,800.00 107 CONSTRUCT END OF MAIN HYDRANT GATE VALVE AND TEE ASSEMBLY 1 EA $7,800.00 $7,800.00 108 REMOVE AND SALVAGE END OF MAIN HYDRANT 1 EA $500.00 $500.00 109 CONSTRUCT 12" x 11.25 DEGREE BEND WITH BACKING BLOCK 4 EA $1,350.00 $5,400.00 110 CONSTRUCT 12" x 22.5 DEGREE BEND WITH BACKING BLOCK 4 EA $1,750.00 $7,000.00 111 CONSTRUCT 12" x 45 DEGREE BEND WITH BACKING BLOCK 4 EA $1,850.00 $7,400.00 112 CONSTRUCT 12" x 90 DEGREE BEND WITH BACKING BLOCK 1 EA $1,950.00 $1,950.00 113 CONSTRUCT 12" M.J. GATE VALVE AND BOX 2 EA $3,710.00 $7,420.00 114 CONSTRUCT 12"x12"x8" M.J. TEE ASSEMBLY AND BACKING BLOCK 1 EA $1,660.00 $1,660.00 115 SEEDING, TYPE B 1 AC $3,710.00 $3,710.00 116 ROLLED EROSION CONTROL, TYPE II 5,000 SY $3.00 $15,000.00 CONTINGENCY $11,860.00 SUBTOTAL CORNHUSKER RD WATER MAIN $248,800.00 TOTAL ESTIMATED CONSTRUCTION COST $1,042,300.00 ESTIMATED ENGINEERING, TESTING, LEGAL, FINANCING, PUBLICATION AND MISCELLANEOUS COSTS $378,700.00 TOTAL ESTIMATED PROJECT COST $1,421,000.00 Upon approval, the Owner will issue payment to the Contractor in the amount of 90% of the contracted value of the completed work as of the end of the preceding month, as recommended by the Engineer. Payment for the balance retained will be issued by the Owner upon completion of the work and approval thereof by the Owner's Engineer, City or Governmental approval when necessary, and acceptance by the Owner. Contractor must give 24-hour notice to Engineer when picking up paper sets. Each bid shall be accompanied, in a separate sealed envelope, by a certified or bank check drawn on a bank whose deposits are insured by the F.D.I.C. or an acceptable bid bond in the amount of $52,000.00 and shall be payable without condition to SANITARY AND IMPROVEMENT DISTRICT NO. 341 OF SARPY COUNTY, NEBRASKA as a guarantee that the bidder, if successful, will execute the contract and provide an acceptable Contract Bond from an approved surety in the amount of 100 percent of the contract price. No bidder may withdraw his Bid for a period of THIRTY (30) days after the date set for the opening of bids. The Owner reserves the right to reject any or all bids and to waive informalities. Completion Date: 35 Working Days

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents