Similar Projects
Last Updated | 07/18/2019 02:16 AM |
Project Title | Replacement of Bridge |
Physical Address | View project details and contacts |
City, State (County) | PA (Bucks County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnishing of all labor, material, equipment and work necessary for the removal of an existing single-span steel bridge over the PA Turnpike (I-276) and construction of new two-span steel plate girder bridge. The contract also includes reconstruction of S.R. 2006 approach roadway, realignment of two side roads, utility installations, drainage modifications, signing and pavement markings, temporary traffic signals, and the construction of the mainline median/shoulder at the proposed bridge location. 29,280 Cy Excavation, Various Classes 2,265 Ton Superpave Asphalt Mixture, Wearing Course, Various Depths 1,895 Ton Superpave Asphalt Mixture, Binder Course, Various Depths 3,489 Ton Superpave Asphalt Mixture, Base Course, Various Depths 5,516 Ton Subbase, (No. 2a), Various Depths 3,437 Lf 6” Pavement Base Drain 528 Lf Drainage Pipe, Various Sizes And Types 1,675 Lf Guide Rail, Various Types 2,396 Cy Cement Concrete, Various Classes 5,694 Lf Piles, Various Sizes 601,866 Lb Fabricated Structural Steel 268,115 Lb Reinforcement Bars, Epoxy Coated 72,237 Lb Reinforcement Bars | ||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |