Similar Projects
Drainage, Milling, Resurfacing, OGFC, Shoulder and Slope Reconstruction and Guardrail Replacement - US 64
Infrastructure
Bidding
NC

Pond Maintenance Services NC Museum of Art
Term Contract
Bidding
Raleigh, NC 27607

Waste Management Services
Term Contract
Post-Bid
Salisbury, NC 28146

Emergency On Call Snow and Ice Removal Services
Term Contract
Post-Bid
Durham, NC 27701

CVCC Stream Bank Repair
Results
Hickory, NC 28602

Odyssey Drive Culvert Replacement
Results
Less than $687,697 est. value
Durham, NC 27701

Miscellaneous Emergeny Debris Removal
Term Contract
Post-Bid
Wilmington, NC 28403

Stream Debris Removal Project
Results
Wilson, NC 27893

Riverwalk Tree, Limb and Debris Removal Contract
Post-Bid
Belville, NC 28451

Debris Monitoring Services
Term Contract
Results
Wilmington, NC 28403

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

Drainage Installation in Advance of Construction of TIP Project U-5312
Results
Wilkesboro, NC 28697

Rental of Two (2) Eight Yard Dumpster with Pickup Two Times Weekly
Post-Bid
Gastonia, NC 28054

NC73 Pipe Replacement
Results
NC

Trash and Recycling for Crowders Mountain State Park
Term Contract
Post-Bid
Kings Mountain, NC 28086

Last Updated 01/04/2022 11:26 AM
Project Title

Stream Clearing and Snagging Services

Physical Address View project details and contacts
City, State (County) Hampstead, NC 28443   (Pender County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall consist of clearing, snagging, and removal of wood and/or woody debris from designated streams and channels throughout Pender County. Most of the wood and woody debris is a result of hurricane force winds experienced during Hurricane Florence in September of 2018. The purpose of the clearing and snagging work is to “cleanup” designated stream areas and improve overall drainage by removal of temporary block points created by falling woody debris. The debris clearing and removal will allow streams to flow more freely without such obstructions resulting in improved drainage. The scope of work will include: snagging, clearing of fallen trees, logs, stumps, limbs, brush, tops, rubbish, and any other woody debris deposited in and adjacent to the specified streams channels. The specified sites that will be restored under this work scope are identified by location, stream length, and DSR number on the attached spreadsheet entitled “Table 1-EWP Contract 5038 Scope of Work”. Maps are also included in the DSRs showing the approximate stream alignments and locations that are scheduled to be addressed under this contract.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents