Similar Projects
Last Updated | 09/14/2020 08:30 AM |
Project Title | Street Resurfacing at Oxford Walk Subdivision |
Physical Address | View project details and contacts |
City, State (County) | College Park, GA 30337 (Fulton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of College Park (City) is soliciting proposals from qualified contractors to provide professional contractual services for the Department of Public Works, Highways and Streets Division to complete a street resurfacing project street resurfacing work within a subdivision location. 1. For resurfacing, clean, tack each listed street; resurface with 1.5 inches thick layer of 9.5 mm super pave topping material, per each individual as identified street specification at a total lump sum cost. 2. For milling, mill 1.5-inch existing pavement to restore proper grade and or transverse slope, for the 15.5 mm super pave topping material with lime, per each individual as identified per street list specification at a total lump sum cost. 3. Estimate price to include, a. Decal lanes b. Excel lanes c. Turning lanes d. All intersections full width curb to curb e. All Turnout f. Any additional City Parking Spaces, if applicable as identified street specification for the entire length of the project at a total lump sum cost. g. Restripe linear road markings h. Centerline i. Turn arrows j. Stop bars, on each resurfacing project, this should be included in the lump sum price 4. Linear lines shall be painted with Reflective beads. 5. Thermo-plastic material to be used for all turns arrows, stop bars, and crosswalks, edge lines, words symbol and bike lanes. 6. Warning and advance signs are to be displayed 24 hrs. in advance; alerting motorist and the citizens of College Park street resurfacing activities will be take place. a. Include begin and end date of resurfacing project at all times b. Temporary reflective tape shall be use on each individual listed street. 7. Have designated certify flagging personnel present on site actively directing traffic during until completion of the resurfacing project. 8. Contractor must provide a 24-hours clean-up service when each project is completed. 9. All drainage structures within the limits of each project listed will be maintained throughout the duration of the project. Any debris that goes in drainage structures as a result of resurfacing or milling operation will be cleaned out at no additional cost to the City of College Park. 10. The City will locate and identify all manholes and water values 11. An inspection will be done by the City of College Park Public Works Division |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |