Similar Projects
Reported | 12/02/2021 12:00 AM |
Project Title | Uvalde Install Water Well Parts |
Physical Address | View project details and contacts |
City, State (County) | Uvalde, TX 78801 (Uvalde County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | Less than $30,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish all labor, equipment, and materials necessary to maintain the vertical turbine pump at Spurgeon Well with the following requirements: 1. Disassemble the well, including the motor and pump. See the well information at the end of this document. 2. Replace the list of components and refurbish the motor as shown below. 3. Reinstall the pump and motor and conduct a pumping test for 24 hours, while maintaining a constant discharge and recording draw down water levels from ground surface. Provide a copy of the data to the Hatchery Manager. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |