Similar Projects
Water Plant No. 1 Replacement Well
Infrastructure
Bidding
TX

Construction of Irrigation Pump Station No. 3 and Makeup Well No. 2 Improvements Along Katy Gaston Road
Infrastructure
Bidding
Katy, TX 77494

MHF80 Single Stage Vacuum Pump
Post-Bid
Houston, TX 77251

Well 1 Chloramine Conversion
Post-Bid
$150,000 to $200,000 est. value
Morgans Point, TX 77571

Water Treatment Plant Facilities Pump and Motor Maintenance and Repair Services
Results
Less than $2,762,500 est. value
Round Rock, TX 78664

Dane Street Water Well
Results
$1,212,885 est. value
Aubrey, TX 76227

Removal and Installation of Vertical Turbine Pump
Infrastructure
Bidding
Amarillo, TX

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Micron Pump Station Well Pump No. 4 - Micron Well Fit Out P2
Results
Less than $1,800,000 est. value
San Antonio, TX 78251

Pump Trash Centrifugal Portable 3"
Infrastructure
Bidding
Houston, TX

Certification and Calibration of Well Water Meters
Post-Bid
Houston, TX 77072

Water Well No. 2
Results
TX

Well Maintenance Services Contract
Term Contract
Bidding
Seguin, TX

Trinity Aquifer Well Project
Post-Bid
Farmers Branch, TX 75234

Water Plant Well 2 Upgrade
Results
West Columbia, TX 77486

Reported 12/02/2021 12:00 AM
Project Title

Uvalde Install Water Well Parts

Physical Address View project details and contacts
City, State (County) Uvalde, TX 78801   (Uvalde County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value Less than $30,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment, and materials necessary to maintain the vertical turbine pump at Spurgeon Well with the following requirements: 1. Disassemble the well, including the motor and pump. See the well information at the end of this document. 2. Replace the list of components and refurbish the motor as shown below. 3. Reinstall the pump and motor and conduct a pumping test for 24 hours, while maintaining a constant discharge and recording draw down water levels from ground surface. Provide a copy of the data to the Hatchery Manager.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents