Last Updated 02/28/2020 03:35 PM
Project Title

2020 Municipal, C-Funds and Road Fee Resurfacing Project

Physical Address View project details and contacts
City, State (County) Spartanburg, SC   (Spartanburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Municipal Funds: Approximately 3,264 sq. yd of var. milling, 290 cu.yds of installed shoulder dirt, 2,846 sq. yds Grassing, 6,987 sq. yds Cement Reclamation / (Cement Modified Recycled Base of 10 " Depth)/(Mix Design for each location)/ ( CURE METHOD B)Surface (Single) Treatment with Milling (4 Locations), 4,191 sq.yds. of 4” Emulsion Recycle, (includes ,1.4 gallons emulsion per sq.yd ,Grinding, Emulsion ,Compaction, Testing)(36 LOCATIONS) 9,040 lin. Ft. of Striping (thermos), 9,040 lin. Ft. of temp Striping, 1,215 tons of asphalt surface, 762 tons of Intermediate. Asphalt Course 236 tons of Portland cement, 419 Tons of Stone (Crush and Run). and a total of 4520 lin. Ft of white line rumble strips, 4 Thermos Stop bars, Turn Arrows and Crosswalks, 57 Raised Reflectors (installed) 1 Traffic loop installed Contractor is responsible for Mix Design for CMRB Process. C-Funds and Road Fee: Approximately 85,882 sq. yd of var. milling, 6.503 cu.yds of installed shoulder dirt, 51,398 sq. yds Grassing, 185,124 sq. yds Cement Reclamation / (Cement Modified Recycled Base of 10 " Depth)/(Mix Design for each location)/ ( CURE METHOD B)Surface (Single) Treatment with Milling (4 Locations), 87.531 sq.yds. of 4” Emulsion Recycle, (includes ,1.4 gallons emulsion per sq.yd ,Grinding, Emulsion ,Compaction, Testing)(36 LOCATIONS) 276.916 lin. Ft. of Striping (thermos), 276.916 lin. Ft. of temp Striping, 30.400 tons of asphalt surface, 20,586 tons of Intermediate. Asphalt Course 6.249 tons of Portland cement, 2.192 Tons of Stone (Crush and Run).4.367 sq yds Depth Patching at 4” and a total of 138.458 lin. Ft of white line rumble strips, 44,347 sy yds PMST Asphalt thin lift overlay (9 LOCATIONS) 21 Thermos Stop bars, Turn Arrows and Crosswalks, 1,731 Raised Reflectors (installed) 1 Traffic loop installed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents