Similar Projects
Interior and Exterior Painting Services - Floor Covering Services - Refrigeration Service
Post-Bid
Waco, TX 76700

Demolition of 730 East I-20 formerly Toyota Dealership
Demolition
Post-Bid
Duncanville, TX 75116

Aransas Demo Visitor`s Center
Demolition
Results
TX

Retube Heating Boiler, B723
Results
Less than $25,000 est. value
San Angelo, TX 76908

J--Chiller Boiler Systems Repairs MEDVAMC
Post-Bid
Houston, TX 77030

Replacement of Delakalizer for Boiler Feedwater System
Results
Less than $252,100 est. value
Prairie View, TX

Old C North Structural Demolition
Demolition
Post-Bid
Houston, TX

SWWTP Tower Antennas/Lines Removal and Installation
Demolition
Results
Less than $11,000 est. value
Laredo, TX 78043

Odor and Corrosion Control
Post-Bid
La Marque, TX

Boiler Removal and Replacement
Results
Less than $217,800 est. value
Seguin, TX 78155

Standpipe Demolition
Post-Bid
Athens, TX 75770

Water and Air Cooled Chiller Maintenance
Results
San Angelo, TX 76908

Demolition and Re-Construction of a Residential Structure
Demolition
Post-Bid
Bryan, TX 77803

Demolition Services
Results
Mexia, TX 76667

Town Bluff Portable Water System
Post-Bid
Woodville, TX 75979

Last Updated 11/10/2020 02:46 PM
Project Title

Domain four Chillers Demolition Project (CIP)

Physical Address View project details and contacts
City, State (County) Austin, TX 73301   (Travis County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Demolition, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the removal of four existing 2,500 Ton York OM machines; Chiller-1, Chiller-2, Chiller-3 and Chiller -5 from the Austin Energy Domain District Plant. Each of these existing OM machines except for CH-5 are operating with HCFC-22 (also known as R-22) which is classified as a greenhouse gas that contributes to ozone depletion. The demolition scope will also include the removal of all associated piping, power, VFDs, controls, chiller pads and infrastructure associated with the four existing chillers.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents