Similar Projects
Construction Services for Project Improvements (Phase 2)
Bidding
Lakeland, FL

Asphalt Repair
Bidding
$273,000 est. value
FL

Construction Services for Project Improvements (Phase 1)
Post-Bid
Lakeland, FL 33801

Construction Services for Project Improvements (Phase 1)
Post-Bid
FL

Polk Parkway Widening, MP 18-22, and Polk Parkway Resurfacing
Results
Less than $58,761,798 est. value
Auburndale, FL 33823

Construction of Asphalt Parking and Grading
Results
$75,000 est. value
Bartow, FL

Construction Services for Project Improvements Phase 3D also known as Riverstone Phases 5 and 6
Post-Bid
FL

I-4 at 557 Interchange
Results
FL

Railroad Crossing Asphalt Repairs
Post-Bid
Frostproof, FL 33843

Eagle Lake 2019 Resurfacing Project
Results
Eagle Lake, FL 33839

Annual Cape Seal Treatments for Public Works Construction and Maintenance
Term Contract
Post-Bid
Lakeland, FL 33801

Milling and Resurfacing / 3D Model Delivery and Automated Machine Guidance (AMG)
Results
Less than $16,655,393 est. value
FL

Osprey Unit Road Capping
Post-Bid
Less than $130,000 est. value
Polk City, FL

Provide and Install FDOT Recycled Asphalt Mix - Rolling Hills Cemetery
Results
$10,000 to $14,000 est. value
Winter Haven, FL 33880

Tenoroc Public Use Area Road/Parking Maintenance
Post-Bid
Lakeland, FL 33805

Last Updated 09/22/2020 10:53 AM
Project Title

FY 2020-21 Race Road Paving Project

Physical Address View project details and contacts
City, State (County) Dundee, FL   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, materials, equipment and supervision necessary to mill, resurface or overlay Town streets designated on drawings and bid documents for certain Town roads and/or streets, as follows: As depicted on the plans for Sol Vista prepared by Engineers of Central Florida, dated 05-15-14, Sheets 1.0, 3.1, 3.2, 7.2&7.3, and 8.0-8.2, inclusive. BEGINNING at STA 117+50.00 and ENDING at STA 125+89.21. Construction is authorized under SWFWMD exemption issued February 4, 2015.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents