Similar Projects
Create 72 Broadway
New Construction - 99,427 SF
Conception
$15,000,200 est. value
Asheville, NC 28801

Church Avenue Plaza
New Construction - 92,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
High Point, NC 27262

Residence Inn
New Construction - 86,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Asheville, NC 28801

Flat Iron Building
Renovation - 45,792 SF
Design
Asheville, NC 28801

Redevelopment of Moore Square East and South
Renovation
Bidding
Raleigh, NC

Moxy Hotel
Addition - 47,356 SF
Sub-Bidding
Asheville, NC 28801

stayAPT Suites
New Construction - 59,895 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28269

Woodspring Suites
New Construction - 48,755 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28217

BB and T Building Wellness Center Renovation Phase 2
New Construction, Renovation
Results
Greensboro, NC 27401

Renovate Specified Areas within the Gym Located at Ft Bragg, NC
Renovation
Results
$1,000,000 to $5,000,000 est. value
Fort Bragg, NC 28310

Hampton Inn & Suites
New Construction - 150,520 SF
Construction
$8,000,000 est. value
Greensboro, NC 27401

The Colony
New Construction - 550,000 SF
Construction
$400,000,000 est. value
Charlotte, NC 28211

Harrahs Cherokee Valley River Casino
Addition, Alteration
Pending Verification
$275,000,000 est. value
Murphy, NC 28906

Marriott Hotel
New Construction
Pending Verification
Concord, NC 28027

Whiskey Branch
New Construction - 81,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Wilmington, NC

Last Updated 06/06/2022 12:07 PM
Project Title

Home 2 Suites

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28412   (New Hanover County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Hotel/Motel
Contracting Method
Project Status Construction Commenced May 2022, Construction Completion Expected July 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 to $9,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, New Construction, 1 Hotel/Motel, 4 Stories Above Grade, 55,276 SF New Construction 104 Unit(s).
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Hospitality Furniture.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents