Similar Projects
Sidewalk Replacement Project
Infrastructure
Bidding
$150,000 est. value
Winthrop, MA

Sidewalk Replacement
Infrastructure
Bidding
Less than $150,000 est. value
Winthrop, MA

Sixth and Walnut Street CDBG Sidewalk Improvement Project
Post-Bid
Chelsea, MA 02150

Construction of Concrete Sidewalks and Resetting of Granite Curbing in Varous Locations
Post-Bid
Winthrop, MA

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $2,395,000 est. value

Construction Services - Drainage, Sidewalks and Roadways
New Construction
Construction
$2,268,000 est. value
Boston, MA

Orange Street Sidewalk and Roadway Improvement
Infrastructure
Bidding
Less than $260,000 est. value
Chelsea, MA 02150

Sidewalk Improvements
Post-Bid
Revere, MA 02151

Pedestrian Ramp Reconstruction and Sidewalk
Results
$2,152,800 est. value
Boston, MA

ADA Sidewalk Ramp Replacement Project
Post-Bid
Chelsea, MA 02150

Small Repairs - Streets and Sidewalks
Results
Less than $500,000 est. value
Revere, MA

Tripping Hazards at Various Federal Elderly Developments
Post-Bid
Less than $2,300,000 est. value
Boston, MA

Curley K-8 Exterior Walkway - General Bids
Results
Less than $1,879,927 est. value
Boston, Jamaica Plain, MA 02130

Carter Street Bicycle and Pedestrian Improvements
Post-Bid
Chelsea, MA 02150

Reported 06/16/2021 03:02 PM
Project Title

Exterior Egress Walkways

Physical Address View project details and contacts
City, State (County) Chelsea, MA 02150   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior Walkway Improvements - The work includes but is not limited to new accessible exterior concrete walkways and in compliance with NFPA 101 Life Safety Chapter 33, from the Keville Building, Headquarters, and the John Adams Building to common areas away from the buildings.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 05 - Metals, Metal Stairs, Metal Railings.
Division 31 - Earthwork, Site Clearing, Excavation and Fill, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Turf and Grasses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents