Similar Projects
2023 Short Line Project
Infrastructure
Results
$354,704 CJ est. value
Carson City, NV 89701

Paint and Painting Supplies
Term Contract
Post-Bid
Las Vegas, NV 89101

Del Sol Academy of the Performing Arts - Paint Exterior Metal Surfaces
Renovation
Results
$265,973 CJ est. value
Las Vegas, NV 89120

Painting Maintenance Project 2023
Term Contract
Post-Bid
$6,500,000 CJ est. value
Minden, NV 89423

Chip Seal, Double Chip Seal and Border Sign Packages
Infrastructure
Sub-Bidding
$5,500,000 CJ est. value
Wells, NV 89835

Chip Seal, Double Chip Seal and Border Sign Packages
Infrastructure
Sub-Bidding
$5,500,000 CJ est. value
Wells, NV 89835

RFQ Contractor - Eureka County Crescent Valley Tank No.3 Re-Painting Project
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Eureka, NV 89316

3/8 Chip Seal With Areas of Patching
Infrastructure
Sub-Bidding
$2,200,000 CJ est. value
Caliente, NV 89008

TMCC - Sierra Building Hallway Painting
Term Contract
Post-Bid
$200,000 to $300,000 est. value
Reno, NV 89512

Exterior Painting of Maintenance Building at Sparks High School
Alteration
Post-Bid
Sparks, NV 89431

Exterior Painting at Peavine Elementary School
Alteration
Post-Bid
Reno, NV 89503

Eureka County School District Exterior Painting Improvements
Renovation
Sub-Bidding
$500,000 CJ est. value
Reno, NV 89502

Paint Visitor Centers, Great Basin NP
Alteration
Post-Bid
$100,000 to $250,000 est. value
Baker, NV 89311

Last Updated 06/13/2023 05:15 PM
Project Title

Carson High School Paint Exterior of Building Project

Physical Address View project details and contacts
City, State (County) Carson City, NV 89701   (Carson City County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from Agency's Affiliate - 05/22/23
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: The scope of this project is to completely repaint the entire existing Carson High School. The scope of painting is limited to the main building and east side mechanical room only with the exception of two additional structures; Maintenance Garage (CMU) and Track Storage Building (Wood siding) which are listed together as Additive Alternate 1. The building is comprised of numerous substrates including Concrete Precast Panels, Stucco/EIFS, CMU (Split and Smooth Face), Metal including handrails, doors and frames, window eye brows, mechanical equipment screens and siding (Large Gym). There are also small areas of wood and spandrel panels. Add Alternate No. 1: Scope of work involves painting two structures located adjacent to the running track and football field. The Maintenance Garage and Track Storage Building.The Maintenance Garage and Track Storage Building. The Construction Cost Estimate is $280,00.00 Prevailing Wages must be paid on this project. See requirements regarding prevailing wage reporting in Nevada Revised Statutes(NRS) Section 338.070.You may contact Mark Johnson, 775-283-2170, mjohnson@carson.k12.nv.us, or Karen Jackson, 775-283-2155, kjackson@carson.k12.nv.us if you have any questions about the RFP package. Major subcontractors are strongly encouraged to attend, although major subcontractor attendance is not required. A representative from each potential General Contractor must be in attendance and sign-in to be eligible to bid.Firms interested in submitting a bid in response to the Invitation to Bid must meet the requirements of NRS 338 as it relates to eligible bidders which include, but are not limited to the following requirements: be licensed as a contractor with appropriate license limit and class, be qualified to bid on public works projects (as qualified by the State of Nevada Public Works Division), have appropriate bonding limit and levels of insurance to, at a minimum, cover the total cost of construction. The right is reserved by CCSD to reject any or all bids, or to accept the bid deemed best for the interest of CCSD, in accordance with NRS. The plans are password protected, please call Karen Jackson at 775-283-2155, kjackson@carson.k12.nv.us for password. The scope of this project is to completely repaint the entire existing Carson High School. The scope of painting is limited to the main building and east side mechanical room only with the exception of two additional structures; Maintenance Garage (CMU) and Track Storage Building (Wood siding) which are listed together as Additive Alternate 1. Carson High School (CHS) Paint Exterior of Building Project shall begin on July 10, 2023, with the issuance of the Notice to Proceed. The Carson High School Paint Exterior of Building Project is to be completed on or before September 22, 2023. All bid questions & RFI's are due to Darrin Berger, Architect and Karen Jackson on or before Wednesday, June 7, 2023, 2:00 p.m. Bid questions are to be submitted via email to darrin@bharchitects.biz and kjackson@carson.k12.nv.us. An Addendum entitled Questions & Answers will be posted by Friday, June 9, 2023 on the Bond & Capital bidding opportunity website, under the Departments / Bond & Capital Projects " Bond & Capital Bidding Opportunities" tab.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents