Similar Projects
Sawyer Mill Upper Dam Removal and Bellamy River Restoration
Construction
Dover, NH 03820

Wetland and Stream Restoration Project, Cobbett’s Pond
Renovation
Construction
Windham, NH

Macallen Dam - Abutments and Outlet Structure Rehabilitation
Results
Newmarket, NH

Downtown Tunnel Project
Results
$2,000,000 est. value
Lebanon, NH

Debris Removal and Coffer Dam Installation at Downing’s Landing Boat Access Area
Results
Concord, NH

Deer Run Pond Dam Rehabilitation
Results
$300,000 to $350,000 est. value
Campton, NH 03223

Woodward Dam Improvements
Results
Less than $1,474,000 est. value
Roxbury, NH

Fire Pond Dredging and Dam Improvements
Results
Less than $60,000 est. value
Swanzey, NH

Pleasant Lake Watershed Restoration
New Construction
Design
Deerfield, NH

Z--Decommissioning of Dam, Great Bay NWR, NH
Results
$500,000 to $1,000,000 est. value
Newington, NH

Improvements to Hood Pond Dam and Rail Trail
Results
Derry, NH

Last Updated 02/03/2021 02:03 PM
Project Title

New Boston Air Force Station, Dam Repair, New Boston, NH

Physical Address View project details and contacts
City, State (County) New Boston, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Army Corps of Engineers, New England District is issuing a set aside for certified small business contractors for the Repairs to two earthen dams at the New Boston Air Force Station (NBAFS), located in New Boston, New Hampshire. The project is planned to be issued in June 2020, and will be set aside for Small Businesses. The construction will extend over a four-month period occurring in the summer or fall of 2020. This project has the following major components. Green Tree Reservoir – One (1) Dam Conveyance Structure. Construction of cofferdam or other dewatering methods. - Demolition and removal of an existing corrugated metal pipe. - Construction of a new open-top precast box culvert in the same location. Beaver dam debris, demolished and removed to a location on-site. The old concrete intake and fire line will be removed and disposed offsite. Seavey Pond – One (1) Dam Conveyance Structure. Construction of cofferdam or other dewatering methods. Demolition and removal of an existing corrugated metal pipe. Demolition and removal of an existing concrete riser section with pipe cast inside a Construction of a new precast riser section and conduit pipe in the same footprint.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents