Similar Projects
Replace Superstructure
Demolition, New Construction, Infrastructure
Conception
$747,338 CJ est. value
Anderson, IN 46011

Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 CJ est. value
Crown Point, IN 46307

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 CJ est. value
Crown Point, IN 46307

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$977,498 CJ est. value
Warren, IN 46792

Asphalt Resurface
Infrastructure
Bidding
$675,000 CJ est. value
Centerville, IN 47330

Bartholomew C.S.C. - Columbus East High School - Athletic Improvements - Bid Package 5
Infrastructure
Sub-Bidding
$450,000 CJ est. value
Columbus, IN 47201

Duke Energy Relocation Plans Phase 2 North
Alteration
Post-Bid
Carmel, IN

RFP/RFQ Infrastructure to Support Housing
Infrastructure
Post-Bid
Austin, IN

River Ridge Elevated Water Storage Tanks
Results
Jeffersonville, IN 47130

East Mall Phase 2B Site Improvements
Results
Muncie, IN

River Ridge Development Authority Development
New Construction, Infrastructure
Pending Verification
$162,000,000 CJ est. value
Jeffersonville, IN 47130

Simon Moon Park - City of Westfield
Renovation, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Westfield, IN 46074

Wastewater Treatment Plant Expansion - River Ridge Development Authority
Infrastructure
Conception
$40,000,000 est. value
Jeffersonville, IN 47130

Drainage Ditch Correction
Infrastructure
Design
$528,000 CJ est. value
Paoli, IN 47454

Last Updated 09/30/2022 06:32 PM
Project Title

Michigan Road Pump Station

Physical Address View project details and contacts
City, State (County) Madison, IN 47250   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of: Construction of the existing Michigan Road Pump Station, complete with wet well, valve vault, installation of two (2) pumps and associated controls, DI station piping and fittings, the control panel, approximately 2,600 of PVC force main, 50 PVC gravity sewer, and all other items shown on the plans and mentioned in the specifications for a complete project, ready for continuous operations. The Bidder awarded this project shall complete the project within 150 calendar days after notice to proceed is issued. Liquidated damages will be assessed at $1,000.00 per calendar day. The information for Bidders, Forms of Bid, Forms of Contract, Plans, Specifications, and Forms of Bid Bond, Performance and Payment Bond, and other contract documents for the Project can be purchased at the following designated website: electronically Each Bidder shall submit with their bid an acceptable security in the amount, form and subject to the conditions provided in the Invitation to Bid and Instructions to Bidders. No Bidder may withdraw his Bid within ninety (90) days after the actual date of bid opening. The City of Madison, Indiana reserves the right to waive any bidding informality or to reject any or all bids. **As an alternative, plans and specifications may be examined at 10:00 am EST on September 12 th , 2022, at the following: City Hall, 101 W. Main Street, Madison, Indiana 47250 Construction of the existing Michigan Road Pump Station, complete with wet well, valve vault, installation of two (2) 45 HP pumps and associated controls, DI station piping and fittings, the control panel, approximately 2,600' of 4" PVC force main, 25' PVC gravity sewer, and all other items shown on the plans and mentioned in the specifications for a complete project, ready for continuous operations.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents