Similar Projects
High Density Polyethylene (HDPE) Pipe Culvert
Bidding
Fancy Gap, VA 24328

Precast Slabs
Post-Bid
VA

140'X 32" Round Smooth Wall Pipe Appomattox Area Headquarters
Post-Bid
Appomattox, VA 24522

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Stream Bank Stabilization at Mason`s Shenandoah Parking Garage
Results
Fairfax, VA 22030

Polymer Coated Corrugated Metal Pipe - Willis and Check Areas
Post-Bid
Check, Willis, VA 24380

Storm Water Ditches at Riverheads Elementary School
Results
Staunton, VA 24401

Deep Creek Interceptor Force Main Replacement
Results
$4,183,093 est. value
Chesapeake, VA

Tusico Branch Stream Restoration
Results
Fairfax, VA

Original Building Demolition and Box Culvert Construction
Results
$6,075,000 est. value
Arlington, VA 22201

Pipe Rehabilitation VDOT Culpeper District
Term Contract
Results

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

On-Call Rock Slope Repair
Results
Less than $6,174,000 est. value

Plain Concrete and Storm Drainage Construction
Results
Herndon, VA

HDPP Pipe Culpeper District
Term Contract
Results
Bealeton, Crozet, Culpeper, Free Union, Gainesville, Gordonsville, Keene, Louisa, Marshall, Mineral, Palmyra, Pratts, Rhoadesville, Ruckersville, Troy, Warrenton, Washington, VA

Last Updated 03/24/2021 03:38 PM
Project Title

Bayberry Subdivision Drainage Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Newport News, VA   (Newport News City County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of replacing all existing storm drainage structures along a portion of Wendfield Circle and Harpersville Road. The project also includes adding sidewalk and trench drain along Harpersville Road from its current end at Wendfield Circle to Bayberry Drive, and adding a crosswalk to Chestnut Memorial United Methodist Church.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents