Similar Projects
2022 Dixon Well 9 Pump and Well Inspection Project
Infrastructure
Bidding
Holly Ridge, NC 28445

I-85 Connector Project
Infrastructure
Bidding
Kings Mountain, NC

Burton Park Castle Hayne Monitoring Wells
Post-Bid
Jacksonville, NC 28541

Petroleum Tank Installation, Operations and Maintenance Services
Term Contract
Post-Bid
Charlotte, NC 28206

Boat Refueling System Repairs for the U.S. Coast Guard (USCG) Station Hatteras Inlet
Results
Hatteras, NC 27943

Contract III - 2020 USDA Well Building Improvements
Results
Red Springs, NC 28377

Pump and Motor Repair Services
Infrastructure
Bidding
Monroe, NC

Ostwalt Amity Area Water System Expansion Contract II - Well Buildings
Post-Bid
NC

Fuel Equipment Upgrades
Results
Greensboro, NC 27405

Industrial Meter and Regulator Station
Infrastructure
Bidding
Battleboro, NC 27809

Lower Rocky River Pump Station Screening and Influent Gate Replacement
Post-Bid
Harrisburg, NC 28075

Wake Tech Fuel Station Decommissioning Project
Results
Raleigh, NC 27603

Health Science Campus Central Utility Plant Deaerator and Surge Tank Replacement
Infrastructure
Bidding
$800,000 to $1,300,000 est. value
Greenville, NC 27834

Turbo Molecular Vacuum Pump
Post-Bid
Raleigh, NC 27695

100,000-Gallon Single Pedestal Elevated Water Tank Old Town Hall Demolition
Results
Kenly, NC 27542

Last Updated 12/28/2021 09:22 AM
Project Title

Raw Water Intake Mitigation

Physical Address View project details and contacts
City, State (County) Lumberton, NC 28360   (Robeson County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following major items: Raising three (3) raw water pumps and platforms. Install new steps. Relocating pump controls to a new elevated generator platform. Upsizing existing generator fuel tank. Raise and extend generator platform. Install new fuel tank, new steps and fencing.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents