Similar Projects
The London Condominiums
New Construction
Conception
Boise, ID 83702

Meta Data Center
New Construction - 960,000 SF
Conception
$800,000,000 est. value
Kuna, ID

North 4th Street Mixed Use Development
New Construction
Design
Boise, ID 83702

College of Eastern Idaho Future Technology Building
New Construction
Design
Idaho Falls, ID 83404

Atlas Waterfront Project Phase 2
New Construction - 1,012,500 SF
Bidding
$10,000,000 est. value
Coeur d'Alene, ID

Albertsons Library 1st Floor Renovations
Renovation
Bidding
$200,000 est. value
Boise, ID 83706

Lathe with Live Tooling
Renovation, Term Contract
Post-Bid
Twin Falls, ID 83301

Idaho State University Turner Hall Restroom Remodel - Abatement and Selective Demolition
Renovation
Post-Bid
Pocatello, ID 83201

Renovations, Upgrades, Labs Science Building
Renovation
Results
$1,450,000 est. value
Boise, ID 83725

ISU Relocate Testing Center
Renovation
Results
$297,500 est. value
Idaho Falls, ID 83402

5th & Grove BETA Office Building
New Construction - 6,148 SF
Construction
$2,000,000 to $3,000,000 est. value
Boise, ID 83702

Downtown Boise Revamp Projectr
Renovation - 98,000 SF
Pending Verification
$180,000,000 est. value
Boise, ID 83702

Office Building
New Construction - 4,800 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Nampa, ID 83687

5th & Grove BETA Office Building
Build-Out - 6,148 SF
Design
Boise, ID 83702

Taylor Hall Stairs Boise State University
Renovation
Bidding
$522,000 est. value
Boise, ID 83725

Last Updated 04/22/2022 04:25 AM
Project Title

New Office/Conference Room SP, Maintenance/Weld Shops, Idaho State University, Pocatello

Physical Address View project details and contacts
City, State (County) Pocatello, ID 83201   (Bannock County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $439,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, New Construction, College/University, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents