Similar Projects
Olmsted Lock and Dam Final Site Restoration
Design
$1,000,000 to $5,000,000 est. value
Olmsted, IL 62970

Dike & Revetment - USACE St. Louis District
Design
$15,000,000 est. value
Cairo, IL

A/B and C/D Service Tunnel Rehabilitation - Phase III
New Construction
Bidding
$16,625,000 to $20,125,000 est. value
Chicago, IL

Upgrade Steam Tunnel Distribution System
New Construction
Bidding
$3,877,600 est. value
Oak Brook, IL

Olmsted Pole Barn 1 & 2 Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Olmsted, IL 62970

Mel Price Lift Gate Replacement
Post-Bid
Alton, IL

Lakeside Tunnel Isolation at Dallman Power Station
Renovation
Results
Springfield, IL 62701

Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

Crab Orchard Dam Spillway Concrete Repairs
Design
$1,000,000 to $5,000,000 est. value
IL

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Post-Bid
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Hammel Woods Dam Modification
Results
Shorewood, IL 60431

Chicago Harbor Lock Chamber Floor and Wall Repair
Renovation
Design
$25,000,000 to $100,000,000 est. value
Chicago, IL

Mel Price Main Lock Overlook Alterations
Renovation
Post-Bid
Alton, IL 62002

McKinley Woods Preserve Bridge Over the I and M Canal Improvements
Results
Less than $170,000 est. value
Channahon, IL 60410

Chicago Harbor Lock Power Distribution Upgrades
Renovation
Design
$250,000 to $500,000 est. value
Chicago, IL 60604

Last Updated 10/04/2021 09:08 AM
Project Title

Peoria and LaGrange Dams Composite Wicket Gates

Physical Address View project details and contacts
City, State (County) Peoria, IL   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract includes the design, fabrication, and supply of fiber reinforced polymer (FRP) composite wicket gates for the Peoria and LaGrange Dams located on the Illinois River. The composite wicket gates shall be manufactured with a vacuum assisted resin transfer molding process. The composite wicket gates will need to meet the fits and function of the current wooden wicket gates as used at the locks and dams. The Peoria wicket gate size is 197 inches long and 46 inches wide with a thickness of 9 inches. The LaGrange wicket gate size is 179 inches long and 46 inches wide with a thickness of 9 inches. There are 108 wicket gates at Peoria and 109 wicket gates at LaGrange, and the contract is set up with options to cover the quantity of wicket gates. The gates will need to be designed to meet the physical and engineering properties specified within the contract. The composite wicket gates will need to be compatible with the existing steel hardware used on the current wooden wicket gates. The primary composite materials must be commercial grade E-glass fibers and vinyl ester resin. Other resin additives such UV inhibitors, fillers, or pigments are permitted to meet requirements such as color and environmental protection. Upstream surface and edges will need to have protection for impact durability and abrasion resistance using ultra-high molecular weight polyethylene (UHMWPE) sheeting. The composite wicket gates are to be custom design and built items. Other than the steel hardware, the composite wicket color shall be yellow.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents