Similar Projects
Milledgeville Streetscape - Phase IV
Results
Milledgeville, GA

Gwinnett Street Widening
Results
Savannah, GA

Phase I Entrance Road
Results
Savannah, GA 31400

Jekyll Island Road Resurfacing
Results
Jekyll Island, GA 31527

Southern Region Disaster Recovery Support BPA
Results

Last Updated 01/10/2020 03:53 PM
Project Title

Road Resurfacing Package 1 - 3 Roads

Physical Address View project details and contacts
City, State (County) GA   (Haralson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $974,873
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing & striping 3.20 miles of Pope Lake Road from Hwy. 100 to Steadman Road. The road is to be resurfaced with Recycled Leveling including Bitum Tackcoat & H Lime (85#/SY) & Recycled 9.5MM Type I including Bitum & H Lime (135#/SY), totaling 220#/SY. No resurfacing shall be done unless the temperature is at least 45 degrees & rising; and all work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents