Similar Projects
Rhinelander - Woodruff, Kildeer Road - Vilas County Line
Infrastructure
Bidding
WI

Rhinelander-Oneida County Airport
Infrastructure
Bidding
Rhinelander, WI

Chip Seal, Fog Seal, GSB-88 and Prep Work 2021 Road Maintenance
Post-Bid
Rhinelander, WI

Bolger Lake Road Work
Infrastructure
Post-Bid
Minocqua, WI 54548

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

City Of Lax - Greenbay Sw And Curb Replacement
Infrastructure
Post-Bid

Hancock Oneida Road Reconstruction
Results
WI

Paving Approximately 5 Miles of Roads
Results
Hazelhurst, WI

2021 Road Improvements
Results
Three Lakes, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2021 Monico Street Improvements
Results
Rhinelander, WI 54501

Minocqua - Manitowish, Woodland Drive - CTH M
Results
Manitowish, Minocqua, WI 54545

Fifield - Woodruff, Morgan Road - USH 51
Results
Fifield, Woodruff, WI 54548

Monico - Laona, USH 45 North to Forest County Line
Infrastructure
Results
Laona, Monico, WI

Last Updated 02/14/2022 03:31 AM
Project Title

Monico - Eagle River, STH 32 to Vilas County Line

Physical Address View project details and contacts
City, State (County) WI   (Oneida County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Milling, Grade, Storm Sewer, Culvert Pipe, Base, Concrete Pavement, Asphalt Pavement, Curb and Gutter, Sidewalk, Lighting, Signing, and Pavement Marking. Excavation Common, 4,416 CY; Base Aggregate Dense, 5,834 Ton; Concrete Pavement, 15 SY; Marking Epoxy, 88,340 LF; Construction Staking, 35,562 LF; Construction Staking, 11 Each; Construction Staking, 2 LS; Conduit, 45 LF; Culvert Pipe, 156 LF 24”, 236 LF 36“, 196 LF 42“; Storm Sewer Pipe, 18 LF 12“, 87 LF 15“; Concrete Curb, 145 LF; Concrete Curb and Gutter, 7,580 LF; Concrete Sidewalk, 7,720 SF; Asphaltic Surface, 860 Ton; HMA Pavement, 17,540 Ton; Removing Asphaltic Surface Milling, 103,620 SY; Tack Coat, 7,360 Gals; Signs, 5 SF; Riprap, 90 CY; Concrete Bases, 2 Each; Protective Thermoplastic Coating at Snowmobile Trail Crossings, 260 SY

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents