Project Title | Digester 3 Cleaning Services |
Physical Address | View project details and contacts |
City, State (County) | Wilmington, NC 28412 (New Hanover County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of the cleaning of one (1) anaerobic digester, identified as Tank No. 3 at the Southside Wastewater Treatment Plant (SSWWTP). The SSWWTP is a secondary treatment facility permitted to treat up to 12 million gallons per day (MGD), but currently treats 6.5 MGD on average. Complete contents removal and disposal will be the responsibility and cost of the Contractor, which includes temporary on-site sludge dewatering. Inclusive with this project will be close coordination with plant operational staff. The Contractor shall furnish all the necessary labor, materials, and equipment, to remove all grit, screenings, sand, sludge, macro-fauna (snails) and floatables, and transfer to the onsite sludge pad. The Contractor shall coordinate all phases of the work with the Owner. Hereinafter, the grit, screenings, sand, sludge, snails, and floatables will be referred to simply as residuals. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |