Similar Projects
Patching, Milling, Resurfacing, Guardrail Replacement and Culvert Replacements on US 36
Infrastructure
Bidding
$2,000,000 est. value
Decatur, IL 62523

Cold-In-Place Recycling and HMA Resurfacing
Infrastructure
Bidding
$2,000,000 est. value
Decatur, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Faries Park Roadway
Alteration
Post-Bid
Decatur, IL 62526

Designed Overlay, Bridge Repair and Ramp Repair
Results
IL

2021 MFT Street Improvement
Results
Decatur, IL

Reconstruction
Infrastructure
Bidding
$2,000,000 est. value
Decatur, IL 62526

Bus Barn Pavement
Infrastructure
Post-Bid
Argenta, IL 62501

Road Improvements
Results
Less than $949,610 est. value
Decatur, IL 62501

Microsurfacing Project
Infrastructure
Bidding
$300,000 est. value
Decatur, IL

Asphalt Pad Sinawik Bid
Infrastructure
Post-Bid
Decatur, IL 62521

Milling and resurfacing at 3 locations: 1) US 51 at IL 48; 2) I-72 at SN 058-0063/64; 3) US 51, 2 miles south of Maroa
Results
Maroa, IL

2021 Greenwood Cemetery Road Resurfacing
Infrastructure
Post-Bid
Decatur, IL 62522

0.6 Miles of Milling with Inlay of Surface Course on IL 105
Results
IL

Various City, County, Township, and Village Streets
Infrastructure
Post-Bid
$198,000 est. value
Decatur, IL

Reported 06/16/2022 12:00 AM
Project Title

Route Gosnell Road

Physical Address View project details and contacts
City, State (County) Dalton City, IL 61925   (Macon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $376,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a Cross-road Culvert Replacement project on TR 245, Gosnell Road in Mt Zion Township, Macon County. Four existing cross road culverts are to be removed and replaced with two new arch culverts with end sections on the upstream end. Rip Rap shall be placed around the upstream end and salvaged concrete shall be placed around the downstream end.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents