Similar Projects
Pre-Event Traffic Signal Repair
Bidding

Sumter County C-462 and Inspiration Drive/Spanish Harbor Drive Signal Project
Bidding
FL

Sumter County Repair and Maintenance of Traffic Signal Devices
Results
Less than $239,802 est. value
Wildwood, FL 34785

Traffic Control Devices
Results
Less than $75,000 est. value

Safety Project/Milling and Resurfacing/Lighting/Traffic Signals
Bidding
$1,725,893 est. value

Sumter County C-466 and Preston Drive Signal Construction
Results
Less than $488,190 est. value
Wildwood, FL 34785

Maintenance of Traffic (Tolls)
Results
Less than $200,000 est. value

Traffic OPS Improvement
Results
Less than $500,000 est. value

Traffic OPS Improvement
Results
Less than $500,000 est. value

Maintenance of Traffic Services
Results
Less than $600,000 est. value

Permanent Traffic Signal Repair
Results

Sumter County Advanced Traffic Management System
Results
Less than $738,738 est. value
Bushnell, FL

District Five Signal Performance Metric (SPM) Equipment
Term Contract
Results

Traffic Ops Improvement
Results
Less than $1,000,000 est. value

Traffic Ops Improvement
Results
Less than $1,000,000 est. value

Last Updated 03/01/2021 10:14 AM
Project Title

Sumter County Signalization at US 301 and C-472

Physical Address View project details and contacts
City, State (County) FL   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $427,482
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will convert an existing directional median opening intersection to a signalized intersection. The project will consist of installing mast arms, signal cabinet and hardware, traffic signals, video detection, and all other equipment necessary to make the signalized intersection operational as identified in the US 301/SR 35 at Sumter County CR 472/CR 216 signal plans. The project will begin at US 301 MP 26.635 and end at MP 26.824.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents