Similar Projects
Environmental Services IDIQ
Design

Environmental Services IDIQ
Design

Annual Contract - Asbestos Abatement
Term Contract
Bidding
FL

Briarwood Stormwater Treatment Facility Water Testing
Bidding
Less than $25,000 est. value
Venice, FL

General Laboratory Analytical Services for the Escambia County Water Quality Laboratory, Rolling Hills Vicinity
Post-Bid
Pensacola, FL 32502

General Laboratory Analytical Services for the Escambia County Waste Services
Post-Bid
Pensacola, FL 32502

2019 Apartment Emergency Rehabilitation Services
Renovation
Results
Less than $1,700 est. value
Ocala, FL 34471

Laboratory Analysis and Sampling
Results
De Land, FL 32720

Restoration and Remediation Services
Bidding
Miami, FL

Environmental Water Monitoring Services
Term Contract
Post-Bid
Kissimmee, FL 34741

Environmental Sample Analysis
Results
Fort Lauderdale, FL 33351

Mold Remediation
Renovation
Bidding
Hollywood, FL 33024

Analytical Laboratory Services
Term Contract
Post-Bid
Fort Pierce, FL 34945

Asbestos Survey at 11800 US 27 South
Results
Sebring, FL 33876

Environmental Water Testing Service
Bidding
Ocala, FL 34472

Last Updated 02/01/2021 12:09 AM
Project Title

Continuing Service Contract for Environmental Services

Physical Address View project details and contacts
City, State (County) FL   (Osceola County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Consultant will be responsible for following environmental protocol set forth by the Owner’s Project Representative or by the School District’s Third Party Environmental Consultant Firm. The Consultant will be responsible for the following: 1. proper “containment and clean-up” or “removal and disposal” of building materials identified as affected with microbial growth, asbestos, lead or other environmental contaminants; and 2. the proper dehumidification and/or removal and disposal of building materials affected by moisture intrusion, coil cleaning/HVAC duct cleaning and appropriate build back of affected construction as requested. These specifications are not intended to cover all variations that may occur, however, the Task Assignment will address anticipated variations. If any discrepancy arises between the general specifications and the Task Assignment, the procedures and instructions in the Task Assignment will prevail for specific job requirements.

Details

Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Physical Decontamination, Biological Decontamination, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Mold Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents